The Putney School data center, Putney is a data center in Putney, Windham County, Vermont. It is mapped as 1 building covering about 100 sq ft. Its power comes off the New England grid (ISO New England), which runs on 56% natural gas, 23% nuclear and 8% hydroelectric.
This data centerOther data centersPower plants (colored by fuel)
| County | Windham County, Vermont |
|---|---|
| Coordinates | 42.98763, -72.55176 |
| On OpenStreetMap | way/1552427895 |
A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's New England grid region, and the county's largest utility is on the ISO New England grid. In 2023, the region's electricity was 56% natural gas, 23% nuclear, 8% hydroelectric and 4% biomass.
Each megawatt-hour carried about 537 lb of CO₂, 30% cleaner than the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's New England grid region (NEWE) in 2023, from eGRID. 103 TWh from 1,274 plants.
| Utility | Business rate | Industrial rate |
|---|---|---|
| Green Mountain Power Corp | 19.2¢ | 10.8¢ |
Utilities that report serving Windham County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Brattleboro (Windham Landfill) | Solar | 5.0 MW | 6.5 mi |
| Technology Drive Solar | Solar | 2.0 MW | 7.7 mi |
| Westminster | Solar | 1.8 MW | 8.4 mi |
| Bellows Falls | Hydroelectric | 40.8 MW | 11.6 mi |
| Ball Mountain Hydro | Hydroelectric | 2.4 MW | 14.9 mi |
| Vernon Dam | Hydroelectric | 35.9 MW | 15.0 mi |
| Chester Power Partners | Solar | 2.2 MW | 20.4 mi |
| Searsburg | Hydroelectric | 4.0 MW | 20.6 mi |
| Kearsarge Gill | Solar | 2.0 MW | 22.2 mi |
| Searsburg Wind Turbine | Wind | 6.0 MW | 22.5 mi |
The largest power plant within 50 miles is Northfield Mountain, a 1,168 MW hydroelectric plant 26 miles away.
Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.