Data Centers in Jefferson County, AL

2 data centers are mapped in Jefferson County, Alabama: 2 buildings covering about 26,800 sq ft of roof. The county is in EPA's Southeast grid region, whose electricity is 55% natural gas, 20% nuclear and 15% coal, at 840 lb of CO₂ per megawatt-hour.

Sites2mapped data centers
Buildings2mapped footprints
Roof area0.6 acbuilding footprints
GridSouthern Companylargest utility's grid

Map

Data centerUnder constructionPower plant (colored by fuel)

Data centers in Jefferson County

Data centerOperatorCityRoof area
DC BLOX BHM1-AOperator not recordedBirmingham0.6 ac
Sungard Systems InternationalOperator not recordedBessemer—

What the grid here generates

Data centers in Jefferson County draw from the regional grid. In 2023, electricity in EPA's Southeast region was 55% natural gas, 20% nuclear, 15% coal and 4% solar, at 840 lb of CO₂ per megawatt-hour, close to the U.S. grid as a whole (765 lb).

Natural Gas 55%Nuclear 20%Coal 15%Solar 4%Biomass 4%Hydroelectric 3%

Share of electricity generated in EPA's Southeast grid region (SRSO) in 2023, from eGRID. 257 TWh from 338 plants.

Utilities that serve Jefferson County

UtilityTypeGridBusiness rateIndustrial rate
Alabama Power CoInvestor OwnedSouthern Company14.8¢8.0¢
City of Bessemer UtilitiesMunicipalTennessee Valley Authority12.7¢7.5¢
City of TarrantMunicipalTennessee Valley Authority14.0¢7.4¢

Utilities that report serving Jefferson County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Power plants in Jefferson County

PlantFuelCapacity
James H Miller JrCoal2,822 MW
ABC CokeNatural Gas3.8 MW

All power plants in Jefferson County →

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me