4 data centers are mapped in Alameda County, California: 4 buildings covering about 1.5 acres (66,000 sq ft) of roof. Operators include Digital Realty, Hurricane Electric. The county is in EPA's California grid region, whose electricity is 43% natural gas, 20% solar and 14% hydroelectric, at 426 lb of CO₂ per megawatt-hour.
Data centerUnder constructionPower plant (colored by fuel)
| Data center | City | Roof area |
|---|---|---|
| Hurricane Electric Fremont 1 | Fremont | 0.8 ac |
| Digital Realty data center, Oakland | Oakland | 0.7 ac |
| QES Computers | Pleasanton | 0.0 ac |
| Petadata | Fremont | — |
Data centers in Alameda County draw from the regional grid. In 2023, electricity in EPA's California region was 43% natural gas, 20% solar, 14% hydroelectric and 8% nuclear, at 426 lb of CO₂ per megawatt-hour, 44% cleaner than the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's California grid region (CAMX) in 2023, from eGRID. 222 TWh from 1,674 plants.
| Utility | Business rate | Industrial rate |
|---|---|---|
| Pacific Gas & Electric Co. | 39.5¢ | 33.1¢ |
| Alameda Municipal Power | 20.1¢ | — |
| WAPA-- Western Area Power Administration | 4.6¢ | 2.9¢ |
Utilities that report serving Alameda County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.
| Plant | Fuel | Capacity |
|---|---|---|
| Russell City Energy Center | Natural Gas | 655 MW |
| Aramis I Solar Project | Battery Storage | 200 MW |
| Mariposa Energy Project | Natural Gas | 200 MW |
| Dynegy Oakland Power Plant | Oil | 149 MW |
| Golden Hills Wind | Wind | 85.9 MW |
| Summit Winds | Wind | 57.5 MW |
| Alameda | Natural Gas | 54.8 MW |
| Golden Hills North Wind Energy Center | Wind | 46.0 MW |
| PE Berkeley | Natural Gas | 28.5 MW |
| Diablo Winds LLC | Wind | 18.0 MW |
| WWTP Power Generation Station | Biomass | 6.6 MW |
| Altamont Gas Recovery | Biomass | 6.0 MW |
| Power Generation Station (PGS) 2 | Biomass | 4.6 MW |
| 7999 Gateway Solar | Solar | 4.6 MW |
| Ameresco Vasco Road | Biomass | 4.4 MW |
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.