Data Centers in Sacramento County, CA

5 data centers are mapped in Sacramento County, California: 5 buildings covering about 15.2 acres (664,000 sq ft) of roof. Operators include NTT, EdgeConneX, Quality Technology Services. The county is in EPA's California grid region, whose electricity is 43% natural gas, 20% solar and 14% hydroelectric, at 426 lb of CO₂ per megawatt-hour.

Sites5mapped data centers
Buildings5mapped footprints
Roof area15 acbuilding footprints
GridCalifornia ISOlargest utility's grid

Map

Data centerUnder constructionPower plant (colored by fuel)

Data centers in Sacramento County

Data centerOperatorCityRoof area
RagingWire CA2NTTSacramento4.7 ac
RagingWire CA1NTTSacramento4.4 ac
RagingWire CA3NTTSacramento3.5 ac
QTS SacramentoQuality Technology ServicesSacramento2.1 ac
Edgeconnex Data CenterEdgeConneXRancho Cordova0.7 ac

What the grid here generates

Data centers in Sacramento County draw from the regional grid. In 2023, electricity in EPA's California region was 43% natural gas, 20% solar, 14% hydroelectric and 8% nuclear, at 426 lb of CO₂ per megawatt-hour, 44% cleaner than the U.S. grid as a whole (765 lb).

Natural Gas 43%Solar 20%Hydroelectric 14%Nuclear 8%Wind 7%Geothermal 4%Biomass 2%Coal 2%

Share of electricity generated in EPA's California grid region (CAMX) in 2023, from eGRID. 222 TWh from 1,674 plants.

Utilities that serve Sacramento County

UtilityTypeGridBusiness rateIndustrial rate
Pacific Gas & Electric Co.Investor OwnedCalifornia ISO39.5¢33.1¢
Sacramento Municipal Util DistPolitical SubdivisionBalancing Authority of Northern California16.3¢13.5¢
WAPA-- Western Area Power AdministrationFederalWestern Area Power Administration - Desert Southwest Region4.6¢2.9¢

Utilities that report serving Sacramento County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Power plants in Sacramento County

PlantFuelCapacity
Cosumnes Power PlantOther Fossil557 MW
FolsomHydroelectric199 MW
Procter & Gamble Power PlantNatural Gas193 MW
Campbell Power PlantNatural Gas174 MW
Rancho Seco Solar II, LLCSolar160 MW
Carson Power PlantNatural Gas126 MW
McClellan (CA)Natural Gas77.0 MW
SloughHouse Solar, LLCSolar50.0 MW
SMUD at GrundmanSolar17.0 MW
Kiefer LandfillBiomass15.2 MW
NimbusHydroelectric13.4 MW
Wildflower Solar 1Solar13.0 MW
Rancho Seco Solar, LLCSolar10.8 MW
SCDA Solar 1Solar7.0 MW
Kiefer Landfill Generating Phase IINatural Gas6.2 MW

All power plants in Sacramento County →

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me