5 data centers are mapped in Sacramento County, California: 5 buildings covering about 15.2 acres (664,000 sq ft) of roof. Operators include NTT, EdgeConneX, Quality Technology Services. The county is in EPA's California grid region, whose electricity is 43% natural gas, 20% solar and 14% hydroelectric, at 426 lb of CO₂ per megawatt-hour.
Data centerUnder constructionPower plant (colored by fuel)
| Data center | City | Roof area |
|---|---|---|
| RagingWire CA2 | Sacramento | 4.7 ac |
| RagingWire CA1 | Sacramento | 4.4 ac |
| RagingWire CA3 | Sacramento | 3.5 ac |
| QTS Sacramento | Sacramento | 2.1 ac |
| Edgeconnex Data Center | Rancho Cordova | 0.7 ac |
Data centers in Sacramento County draw from the regional grid. In 2023, electricity in EPA's California region was 43% natural gas, 20% solar, 14% hydroelectric and 8% nuclear, at 426 lb of CO₂ per megawatt-hour, 44% cleaner than the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's California grid region (CAMX) in 2023, from eGRID. 222 TWh from 1,674 plants.
| Utility | Business rate | Industrial rate |
|---|---|---|
| Pacific Gas & Electric Co. | 39.5¢ | 33.1¢ |
| Sacramento Municipal Util Dist | 16.3¢ | 13.5¢ |
| WAPA-- Western Area Power Administration | 4.6¢ | 2.9¢ |
Utilities that report serving Sacramento County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.
| Plant | Fuel | Capacity |
|---|---|---|
| Cosumnes Power Plant | Other Fossil | 557 MW |
| Folsom | Hydroelectric | 199 MW |
| Procter & Gamble Power Plant | Natural Gas | 193 MW |
| Campbell Power Plant | Natural Gas | 174 MW |
| Rancho Seco Solar II, LLC | Solar | 160 MW |
| Carson Power Plant | Natural Gas | 126 MW |
| McClellan (CA) | Natural Gas | 77.0 MW |
| SloughHouse Solar, LLC | Solar | 50.0 MW |
| SMUD at Grundman | Solar | 17.0 MW |
| Kiefer Landfill | Biomass | 15.2 MW |
| Nimbus | Hydroelectric | 13.4 MW |
| Wildflower Solar 1 | Solar | 13.0 MW |
| Rancho Seco Solar, LLC | Solar | 10.8 MW |
| SCDA Solar 1 | Solar | 7.0 MW |
| Kiefer Landfill Generating Phase II | Natural Gas | 6.2 MW |
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.