6 data centers are mapped in Douglas County, Colorado: 6 buildings covering about 9.9 acres (433,000 sq ft) of roof. Operators include EdgeConneX, Csquare, DataBank, Flexential. The county is in EPA's Rocky Mountains grid region, whose electricity is 32% coal, 26% natural gas and 26% wind, at 1,036 lb of CO₂ per megawatt-hour.

Sites6mapped data centers
Buildings6mapped footprints
Roof area9.9 acbuilding footprints
GridPublic Service Co. of Colorado (Xcel)largest utility's grid

Map

Data centerUnder constructionPower plant (colored by fuel)

Data centers in Douglas County

Data centerOperatorCityRoof area
Flexential Denver - EnglewoodFlexentialEnglewood4.5 ac
EdgeConnex - DEN02EdgeConneXLone Tree2.6 ac
CSquare - DEN2CsquareEnglewood1.8 ac
US Signal - CO01US SignalEnglewood0.6 ac
DataBank - DEN1DataBankLone Tree0.3 ac
EdgeConneX - DEN01EdgeConneXEnglewood—

What the grid here generates

Data centers in Douglas County draw from the regional grid. In 2023, electricity in EPA's Rocky Mountains region was 32% coal, 26% natural gas, 26% wind and 11% hydroelectric, at 1,036 lb of CO₂ per megawatt-hour, 35% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).

Coal 32%Natural Gas 26%Wind 26%Hydroelectric 11%Solar 5%

Share of electricity generated in EPA's Rocky Mountains grid region (RMPA) in 2023, from eGRID. 67.7 TWh from 310 plants.

Utilities that serve Douglas County

UtilityTypeGridBusiness rateIndustrial rate
Public Service Co of ColoradoInvestor OwnedPublic Service Co. of Colorado (Xcel)11.8¢7.7¢
CORE Electric CooperativeCooperativePublic Service Co. of Colorado (Xcel)12.3¢9.4¢
Mountain View Elec Assn, IncCooperativeWestern Area Power Administration - Rocky Mountain Region13.1¢8.6¢

Utilities that report serving Douglas County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Power plants in Douglas County

PlantFuelCapacity
Foothills Hydro PlantHydroelectric3.1 MW
Strontia Springs Hydro PlantHydroelectric1.0 MW

All power plants in Douglas County →

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me