2 data centers are mapped in Broward County, Florida: 2 buildings covering about 2.8 acres (122,000 sq ft) of roof. Operators include Flexential. The county is in EPA's Florida grid region, whose electricity is 75% natural gas, 12% nuclear and 5% solar, at 782 lb of CO₂ per megawatt-hour.
Data centerUnder constructionPower plant (colored by fuel)
| Data center | City | Roof area |
|---|---|---|
| Flexential Fort Lauderdale | Fort Lauderdale | 1.7 ac |
| T-Mobile Everglades MSO Data Center | Sunrise | 1.1 ac |
Data centers in Broward County draw from the regional grid. In 2023, electricity in EPA's Florida region was 75% natural gas, 12% nuclear, 5% solar and 5% coal, at 782 lb of CO₂ per megawatt-hour, close to the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Florida grid region (FRCC) in 2023, from eGRID. 250 TWh from 255 plants.
| Utility | Business rate | Industrial rate |
|---|---|---|
| Florida Power & Light Co | 10.8¢ | 8.0¢ |
| Lee County Electric Coop, Inc - (FL) | 11.4¢ | — |
Utilities that report serving Broward County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.
| Plant | Fuel | Capacity |
|---|---|---|
| Dania Beach 7 | Natural Gas | 1,448 MW |
| Port Everglades | Natural Gas | 1,352 MW |
| Lauderdale | Natural Gas | 1,216 MW |
| Wheelabrator South Broward | Biomass | 66.0 MW |
| CSL Gas Recovery | Biomass | 11.2 MW |
| Pembroke Lakes Mall | Solar | 1.1 MW |
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.