Data Centers in Broward County, FL

2 data centers are mapped in Broward County, Florida: 2 buildings covering about 2.8 acres (122,000 sq ft) of roof. Operators include Flexential. The county is in EPA's Florida grid region, whose electricity is 75% natural gas, 12% nuclear and 5% solar, at 782 lb of CO₂ per megawatt-hour.

Sites2mapped data centers
Buildings2mapped footprints
Roof area2.8 acbuilding footprints
GridFlorida Power & Lightlargest utility's grid

Map

Data centerUnder constructionPower plant (colored by fuel)

Data centers in Broward County

Data centerOperatorCityRoof area
Flexential Fort LauderdaleFlexentialFort Lauderdale1.7 ac
T-Mobile Everglades MSO Data CenterOperator not recordedSunrise1.1 ac

What the grid here generates

Data centers in Broward County draw from the regional grid. In 2023, electricity in EPA's Florida region was 75% natural gas, 12% nuclear, 5% solar and 5% coal, at 782 lb of CO₂ per megawatt-hour, close to the U.S. grid as a whole (765 lb).

Natural Gas 75%Nuclear 12%Solar 5%Coal 5%

Share of electricity generated in EPA's Florida grid region (FRCC) in 2023, from eGRID. 250 TWh from 255 plants.

Utilities that serve Broward County

UtilityTypeGridBusiness rateIndustrial rate
Florida Power & Light CoInvestor OwnedFlorida Power & Light10.8¢8.0¢
Lee County Electric Coop, Inc - (FL)CooperativeFlorida Power & Light11.4¢—

Utilities that report serving Broward County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Power plants in Broward County

PlantFuelCapacity
Dania Beach 7Natural Gas1,448 MW
Port EvergladesNatural Gas1,352 MW
LauderdaleNatural Gas1,216 MW
Wheelabrator South BrowardBiomass66.0 MW
CSL Gas RecoveryBiomass11.2 MW
Pembroke Lakes MallSolar1.1 MW

All power plants in Broward County →

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.