3 data centers are mapped in East Baton Rouge Parish, Louisiana: 3 buildings covering about — of roof. Operators include DartPoints. The county is in EPA's Mississippi Valley grid region, whose electricity is 65% natural gas, 22% nuclear and 8% coal, at 739 lb of CO₂ per megawatt-hour.
Data centerUnder constructionPower plant (colored by fuel)
| Data center | City | Roof area |
|---|---|---|
| Center for Computation & Technology (CCT) | Baton Rouge | — |
| DartPoints Baton Rouge 2 | Baton Rouge | — |
| DartPoints Baton Rouge 1 | Baton Rouge | — |
Data centers in East Baton Rouge Parish draw from the regional grid. In 2023, electricity in EPA's Mississippi Valley region was 65% natural gas, 22% nuclear and 8% coal, at 739 lb of CO₂ per megawatt-hour, close to the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Mississippi Valley grid region (SRMV) in 2023, from eGRID. 176 TWh from 161 plants.
| Utility | Business rate | Industrial rate |
|---|---|---|
| Entergy Louisiana LLC | 9.9¢ | 5.2¢ |
| Dixie Electric Membership Corp - (LA) | 12.1¢ | 10.4¢ |
Utilities that report serving East Baton Rouge Parish to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.
| Plant | Fuel | Capacity |
|---|---|---|
| Louisiana 1 | Other Fossil | 451 MW |
| Louisiana 2 | Natural Gas | 175 MW |
| Formosa Plastics | Natural Gas | 101 MW |
| ExxonMobil Baton Rouge Turbine Generator | Natural Gas | 85.3 MW |
| LSU Cogen | Natural Gas | 19.6 MW |
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.