Data Centers in St. Louis (city), MO

3 data centers are mapped in St. Louis (city), Missouri: 3 buildings covering about 1.6 acres (71,000 sq ft) of roof. Operators include TierPoint, Washington University in St. Louis. The county is in EPA's Mid-Mississippi grid region, whose electricity is 51% coal, 17% natural gas and 16% nuclear, at 1,238 lb of CO₂ per megawatt-hour.

Sites3mapped data centers
Buildings3mapped footprints
Roof area1.6 acbuilding footprints
GridMISO (Midcontinent ISO)largest utility's grid

Map

Data centerUnder constructionPower plant (colored by fuel)

Data centers in St. Louis (city)

Data centerOperatorCityRoof area
Genome Data CenterWashington University in St. LouisSaint Louis0.6 ac
TierPoint data center, Saint LouisTierPointSaint Louis0.5 ac
Netrality Data CentersOperator not recordedSaint Louis0.5 ac

What the grid here generates

Data centers in St. Louis (city) draw from the regional grid. In 2023, electricity in EPA's Mid-Mississippi region was 51% coal, 17% natural gas, 16% nuclear and 13% wind, at 1,238 lb of CO₂ per megawatt-hour, 62% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).

Coal 51%Natural Gas 17%Nuclear 16%Wind 13%

Share of electricity generated in EPA's Mid-Mississippi grid region (SRMW) in 2023, from eGRID. 106 TWh from 243 plants.

Utilities that serve St. Louis (city)

UtilityTypeGridBusiness rateIndustrial rate
Union Electric Co - (MO)Investor OwnedMISO (Midcontinent ISO)9.7¢7.6¢

Utilities that report serving St. Louis (city) to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Power plants in St. Louis (city)

PlantFuelCapacity
Trigen St. LouisNatural Gas34.2 MW

All power plants in St. Louis (city) →

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me