8 data centers are mapped in Douglas County, Nebraska: 11 buildings covering about 28.9 acres (1,257,000 sq ft) of roof. Operators include Cogent Communications, First National of Nebraska, Google, News-Press & Gazette Company. The county is in EPA's Upper Midwest grid region, whose electricity is 38% wind, 35% coal and 13% natural gas, at 920 lb of CO₂ per megawatt-hour.
Data centerUnder constructionPower plant (colored by fuel)
| Data center | City | Roof area |
|---|---|---|
| Google data center, Omaha | Omaha | 20 ac |
| Verizon data center, Omaha | Omaha | 2.3 ac |
| Scott Data Center | Omaha | 1.9 ac |
| First National Technical Center | Omaha | 1.6 ac |
| Union Pacific Jack Koraleski Technology, Research & Development Center | Omaha | 1.2 ac |
| Verizon Wireless data center, 4002 South 149th Circle, Omaha | Omaha | 0.9 ac |
| 1623 Farnam | Omaha | 0.8 ac |
| Omaha Switch | Omaha | 0.4 ac |
Data centers in Douglas County draw from the regional grid. In 2023, electricity in EPA's Upper Midwest region was 38% wind, 35% coal, 13% natural gas and 8% nuclear, at 920 lb of CO₂ per megawatt-hour, 20% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Upper Midwest grid region (MROW) in 2023, from eGRID. 241 TWh from 1,363 plants.
| Utility | Business rate | Industrial rate |
|---|---|---|
| Omaha Public Power District | 8.0¢ | 7.0¢ |
Utilities that report serving Douglas County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.
| Plant | Fuel | Capacity |
|---|---|---|
| North Omaha | Coal | 645 MW |
| Standing Bear Lake | Natural Gas | 163 MW |
| Jones Street | Oil | 130 MW |
| Missouri River Wastewater Treatment | Biomass | 3.0 MW |
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.