4 data centers are mapped in Rockland County, New York: 4 buildings covering about 18.1 acres (789,000 sq ft) of roof. Operators include Bloomberg, Databank, fifteenfortyseven Critical Systems Realty. The county is in EPA's Upstate New York grid region, whose electricity is 33% hydroelectric, 32% nuclear and 25% natural gas, at 241 lb of CO₂ per megawatt-hour.
Data centerUnder constructionPower plant (colored by fuel)
| Data center | City | Roof area |
|---|---|---|
| Data center, 65 3rd Avenue, Orangeburg | Orangeburg | 6.0 ac |
| Databank LGA3 | Orangeburg | 4.5 ac |
| Bloomberg Data Center | Orangeburg | 4.2 ac |
| fifteenfortyseven CSR ORNY1 | Orangeburg | 3.5 ac |
Data centers in Rockland County draw from the regional grid. In 2023, electricity in EPA's Upstate New York region was 33% hydroelectric, 32% nuclear, 25% natural gas and 6% wind, at 241 lb of CO₂ per megawatt-hour, 69% cleaner than the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Upstate New York grid region (NYUP) in 2023, from eGRID. 85.7 TWh from 687 plants.
| Utility | Business rate | Industrial rate |
|---|---|---|
| Orange & Rockland Utils Inc | 16.1¢ | 9.3¢ |
Utilities that report serving Rockland County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.
| Plant | Fuel | Capacity |
|---|---|---|
| Bowline Point | Natural Gas | 1,242 MW |
| Hillburn | Natural Gas | 46.5 MW |
| Lederle Laboratories | Natural Gas | 23.4 MW |
| NY3 Battery | Other Fossil | 3.0 MW |
| Clarkstown Landfill Solar Facility | Solar | 2.0 MW |
| 100 Brook Hill Drive Solar | Solar | 2.0 MW |
| Good Samaritan Hospital | Oil | 1.9 MW |
| Montefiore Nyack Hospital | Oil | 1.6 MW |
| Rockland Bakery Inc. | Natural Gas | 1.6 MW |
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.