FirstLight Data Centers

3 FirstLight data centers are mapped in the U.S. on OpenStreetMap, in 2 states: 3 buildings covering about 1.5 acres (64,000 sq ft) of roof. Weighted by building size, the grids they sit on average 537 lb of CO₂ per megawatt-hour, 30% cleaner than the U.S. grid as a whole (765 lb).

Sites3mapped
States2with a site
Buildings3mapped footprints
Roof area1.5 acbuilding footprints

Map of FirstLight data centers

Data centerUnder construction

By grid region

Grid regionSitesCO₂ lb/MWhLargest sources
New England353756% natural gas, 23% nuclear and 8% hydroelectric

Every mapped site

Data centerPlaceGrid regionRoof area
Oxford NetworksBrunswick, MaineNew England1.3 ac
FirstLight Data CenterPortland, MaineNew England—
FirstLight data center, 77 Aviation Avenue, PortsmouthPortsmouth, New HampshireNew England0.2 ac

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me