Data Centers in Lehigh County, PA

2 data centers are mapped in Lehigh County, Pennsylvania: 2 buildings covering about 4.4 acres (192,000 sq ft) of roof. Operators include Flexential, TierPoint. The county is in EPA's Mid-Atlantic grid region, whose electricity is 54% natural gas, 36% nuclear and 5% coal, at 594 lb of CO₂ per megawatt-hour.

Sites2mapped data centers
Buildings2mapped footprints
Roof area4.4 acbuilding footprints
GridPJM Interconnectionlargest utility's grid

Map

Data centerUnder constructionPower plant (colored by fuel)

Data centers in Lehigh County

Data centerOperatorCityRoof area
Allentown-TekParkTierPointBreinigsville3.3 ac
Flexential Allentown Data CenterFlexentialAllentown1.1 ac

What the grid here generates

Data centers in Lehigh County draw from the regional grid. In 2023, electricity in EPA's Mid-Atlantic region was 54% natural gas, 36% nuclear and 5% coal, at 594 lb of CO₂ per megawatt-hour, 22% cleaner than the U.S. grid as a whole (765 lb).

Natural Gas 54%Nuclear 36%Coal 5%

Share of electricity generated in EPA's Mid-Atlantic grid region (RFCE) in 2023, from eGRID. 286 TWh from 815 plants.

Utilities that serve Lehigh County

UtilityTypeGridBusiness rateIndustrial rate
FirstEnergy Pennsylvania Electric CoInvestor OwnedPJM Interconnection15.2¢8.9¢
PPL Electric Utilities CorpInvestor OwnedPJM Interconnection13.9¢10.9¢

Utilities that report serving Lehigh County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Power plants in Lehigh County

PlantFuelCapacity
Allentown - RuppsvilleSolar2.8 MW
Upper Macungie CSG 1 LLCSolar2.8 MW
OrefieldSolar2.2 MW

All power plants in Lehigh County →

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me