6 data centers are mapped in Williamson County, Tennessee: 6 buildings covering about 3.3 acres (143,000 sq ft) of roof. Operators include Flexential, TierPoint. The county is in EPA's Tennessee Valley grid region, whose electricity is 33% nuclear, 30% natural gas and 28% coal, at 895 lb of CO₂ per megawatt-hour.

Sites6mapped data centers
Buildings6mapped footprints
Roof area3.3 acbuilding footprints
GridTennessee Valley Authoritylargest utility's grid

Map

Data centerUnder construction

Data centers in Williamson County

Data centerOperatorCityRoof area
Flexential Nashville - FranklinFlexentialFranklin1.7 ac
Flexential Nashville - Cool SpringsFlexentialFranklin1.6 ac
Flexential Nashville - BrentwoodFlexentialBrentwood—
TierPoint data center, FranklinTierPointFranklin—
Flexential Brentwood Data CenterFlexentialBrentwood—
Data center, BrentwoodOperator not recordedBrentwood—

What the grid here generates

Data centers in Williamson County draw from the regional grid. In 2023, electricity in EPA's Tennessee Valley region was 33% nuclear, 30% natural gas, 28% coal and 8% hydroelectric, at 895 lb of CO₂ per megawatt-hour, 17% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).

Nuclear 33%Natural Gas 30%Coal 28%Hydroelectric 8%

Share of electricity generated in EPA's Tennessee Valley grid region (SRTV) in 2023, from eGRID. 210 TWh from 171 plants.

Utilities that serve Williamson County

UtilityTypeGridBusiness rateIndustrial rate
Nashville Electric ServiceMunicipalTennessee Valley Authority12.0¢7.6¢
Middle Tennessee E M CCooperativeTennessee Valley Authority11.4¢6.7¢
Duck River Elec Member CorpCooperativeTennessee Valley Authority13.4¢6.9¢
Columbia Power System - (TN)MunicipalTennessee Valley Authority11.5¢6.0¢

Utilities that report serving Williamson County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me