8 data centers are mapped in Tarrant County, Texas: 10 buildings covering about 68.3 acres (2,973,000 sq ft) of roof. Operators include Aligned Data Centers, LLC, Amazon Web Services, CyrusOne, Cyxtera. The county is in EPA's Texas (ERCOT) grid region, whose electricity is 50% natural gas, 23% wind and 13% coal, at 733 lb of CO₂ per megawatt-hour.
Data centerUnder constructionPower plant (colored by fuel)
| Data center | City | Roof area |
|---|---|---|
| Facebook Fort Worth Datacenter | Roanoke | 42 ac |
| Cyxtera Dallas-Fort Worth Data Center | Fort Worth | 7.0 ac |
| QTS Data Center | Roanoke | 6.4 ac |
| Alinged Data Center DFW-03 | Mansfield | 4.3 ac |
| Verizon Wireless Mew Building | Southlake | 4.0 ac |
| DFW7 | Fort Worth | 3.9 ac |
| Novartis | Fort Worth | 1.0 ac |
| Amazon Web Services data center, Euless | Euless | — |
Data centers in Tarrant County draw from the regional grid. In 2023, electricity in EPA's Texas (ERCOT) region was 50% natural gas, 23% wind, 13% coal and 9% nuclear, at 733 lb of CO₂ per megawatt-hour, close to the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Texas (ERCOT) grid region (ERCT) in 2023, from eGRID. 477 TWh from 749 plants.
| Utility | Business rate | Industrial rate |
|---|---|---|
| Denton County Elec Coop, Inc | 14.2¢ | 11.4¢ |
| Tri-County Electric Coop, Inc (TX) | 11.1¢ | 14.0¢ |
| United Electric Coop Service Inc - (TX) | 12.4¢ | 9.3¢ |
Utilities that report serving Tarrant County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.
| Plant | Fuel | Capacity |
|---|---|---|
| Handley | Natural Gas | 1,315 MW |
| Chisholm Grid Energy Storage System | Other Fossil | 100 MW |
| Village Creek Water Reclamation Facility | Natural Gas | 12.4 MW |
| Century BESS | Battery Storage | 10.0 MW |
| Liggett Switch | Battery Storage | 10.0 MW |
| Meadow Park Energy Center | Battery Storage | 9.9 MW |
| TX Fort Worth 5200 Gold Spike Drive | Solar | 4.0 MW |
| Wal266 | Natural Gas | 1.2 MW |
| Wal284 | Natural Gas | 1.2 MW |
| Wal940 | Natural Gas | 1.2 MW |
| Wal972 | Natural Gas | 1.2 MW |
| Wal1455 | Natural Gas | 1.2 MW |
| Wal1801 | Natural Gas | 1.2 MW |
| Wal2980 | Natural Gas | 1.2 MW |
| Wal3284 | Natural Gas | 1.2 MW |
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.