Data Centers in Tarrant County, TX

8 data centers are mapped in Tarrant County, Texas: 10 buildings covering about 68.3 acres (2,973,000 sq ft) of roof. Operators include Aligned Data Centers, LLC, Amazon Web Services, CyrusOne, Cyxtera. The county is in EPA's Texas (ERCOT) grid region, whose electricity is 50% natural gas, 23% wind and 13% coal, at 733 lb of CO₂ per megawatt-hour.

Sites8mapped data centers
Buildings10mapped footprints
Roof area68 acbuilding footprints
GridERCOTlargest utility's grid

Map

Data centerUnder constructionPower plant (colored by fuel)

Data centers in Tarrant County

Data centerOperatorCityRoof area
Facebook Fort Worth DatacenterMetaRoanoke42 ac
Cyxtera Dallas-Fort Worth Data CenterCyxteraFort Worth7.0 ac
QTS Data CenterQuality Technology ServicesRoanoke6.4 ac
Alinged Data Center DFW-03Aligned Data Centers, LLCMansfield4.3 ac
Verizon Wireless Mew BuildingVerizon WirelessSouthlake4.0 ac
DFW7CyrusOneFort Worth3.9 ac
NovartisOperator not recordedFort Worth1.0 ac
Amazon Web Services data center, EulessAmazon Web ServicesEuless—

What the grid here generates

Data centers in Tarrant County draw from the regional grid. In 2023, electricity in EPA's Texas (ERCOT) region was 50% natural gas, 23% wind, 13% coal and 9% nuclear, at 733 lb of CO₂ per megawatt-hour, close to the U.S. grid as a whole (765 lb).

Natural Gas 50%Wind 23%Coal 13%Nuclear 9%Solar 6%

Share of electricity generated in EPA's Texas (ERCOT) grid region (ERCT) in 2023, from eGRID. 477 TWh from 749 plants.

Utilities that serve Tarrant County

UtilityTypeGridBusiness rateIndustrial rate
Denton County Elec Coop, IncCooperativeERCOT14.2¢11.4¢
Tri-County Electric Coop, Inc (TX)CooperativeERCOT11.1¢14.0¢
United Electric Coop Service Inc - (TX)CooperativeERCOT12.4¢9.3¢

Utilities that report serving Tarrant County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Power plants in Tarrant County

PlantFuelCapacity
HandleyNatural Gas1,315 MW
Chisholm Grid Energy Storage SystemOther Fossil100 MW
Village Creek Water Reclamation FacilityNatural Gas12.4 MW
Century BESSBattery Storage10.0 MW
Liggett SwitchBattery Storage10.0 MW
Meadow Park Energy CenterBattery Storage9.9 MW
TX Fort Worth 5200 Gold Spike DriveSolar4.0 MW
Wal266Natural Gas1.2 MW
Wal284Natural Gas1.2 MW
Wal940Natural Gas1.2 MW
Wal972Natural Gas1.2 MW
Wal1455Natural Gas1.2 MW
Wal1801Natural Gas1.2 MW
Wal2980Natural Gas1.2 MW
Wal3284Natural Gas1.2 MW

All power plants in Tarrant County →

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me