Power Plants in Lee County, Florida

Lee County, Florida has 2 power plants totaling 2,740 MW of nameplate capacity. Browse every plant below with fuel type, operator, and capacity.

Plants2operating sites
Capacity2,739 MWnameplate
Generation10.1M MWhannual
CO₂4.8Mmetric tons/year
Natural Gas 98%Biomass 2%

Plant locations

All plants in this county

PlantCityFuelCapacityOperator
Fort MyersFt. MyersNatural Gas2,681 MWFlorida Power & Light Co
Lee County Solid Waste EnergyFort MyersBiomass59.0 MWLee County Board-Commissioners

About power generation in Lee County

Lee County, Florida has 2 power plants totaling 2,740 MW of nameplate capacity. Natural Gas is the dominant fuel source at 98% of installed capacity, followed by Biomass (2%). The largest facility is Fort Myers at 2,680 MW. Data comes from EIA Form 860, EIA Form 923, and EPA eGRID federal releases.

To find plants closer to a specific address in Lee County, use the address lookup — it shows every plant within a chosen radius along with distance, fuel type, and emissions.