Levy County, Florida has 3 power plants totaling 224 MW of nameplate capacity. Browse every plant below with fuel type, operator, and capacity.
| Plant | City | Fuel | Nameplate capacity | Operator |
|---|---|---|---|---|
| Whistling Duck I | Williston | Solar | 75.0 MW | Origis Energy USA, Inc |
| Hardeetown Solar Power Plant | Chiefland | Solar | 74.9 MW | Duke Energy Florida, LLC |
| Bronson Solar | Bronson | Solar | 74.5 MW | Bronson Solar LLC |
Levy County, Florida has 3 power plants totaling 224 MW of nameplate capacity. Solar is the dominant fuel source at 100% of installed capacity. The largest facility is Whistling Duck I at 75 MW. Data comes from EIA Form 860, EIA Form 923, and EPA eGRID federal releases.
To find plants closer to a specific address in Levy County, use the address lookup — it shows every plant within a chosen radius along with distance, fuel type, and emissions.