Power Plants in Levy County, Florida

Levy County, Florida has 4 power plants totaling 75 MW of nameplate capacity. Browse every plant below with fuel type, operator, and capacity.

Plants4operating sites
Capacity74 MWnameplate
Generation123.5k MWhannual
Solar 100%

Plant locations

All plants in this county

PlantCityFuelCapacityOperator
Hardeetown Solar Power PlantChieflandSolar74.9 MWDuke Energy Florida, Llc
Levy Nuclear PlantInglisNuclear— MWDuke Energy Florida, Llc
Bronson SolarBronsonSolar— MWBronson Solar Llc
Whistling Duck IWillistonSolar— MWOrigis Energy Usa, Inc

About power generation in Levy County

Levy County, Florida has 4 power plants totaling 75 MW of nameplate capacity. Solar is the dominant fuel source at 100% of installed capacity, followed by Nuclear (0%). The largest facility is Hardeetown Solar Power Plant at 74 MW. Data comes from EIA Form 860, EIA Form 923, and EPA eGRID federal releases.

To find plants closer to a specific address in Levy County, use the address lookup — it shows every plant within a chosen radius along with distance, fuel type, and emissions.