Seminole County, Florida has 2 power plants totaling 6 MW of nameplate capacity. Browse every plant below with fuel type, operator, and capacity.
| Plant | City | Fuel | Capacity | Operator |
|---|---|---|---|---|
| Seminole Energy | Geneva | Biomass | 4.8 MW | Nextera Renewable Fuels, Llc |
| Altamonte Mall | Altamonte Springs | Solar | 1.5 MW | Altamonte Mall |
Seminole County, Florida has 2 power plants totaling 6 MW of nameplate capacity. Biomass is the dominant fuel source at 76% of installed capacity, followed by Solar (24%). The largest facility is Seminole Energy at 4 MW. Data comes from EIA Form 860, EIA Form 923, and EPA eGRID federal releases.
To find plants closer to a specific address in Seminole County, use the address lookup — it shows every plant within a chosen radius along with distance, fuel type, and emissions.