Early County, Georgia has 4 power plants totaling 194 MW of nameplate capacity. Browse every plant below with fuel type, operator, and capacity.
| Plant | City | Fuel | Nameplate capacity | Operator |
|---|---|---|---|---|
| SR Arlington II | Blakely | Solar | 103 MW | SR Arlington II MT, LLC |
| SR Cedar Springs, LLC | Blakely | Solar | 70.0 MW | SR Cedar Springs, LLC |
| SR Arlington I | Arlington | Solar | 20.0 MW | SR Arlington, LLC |
| Georgia Power at Jakin GA PV | Jakin | Solar | 1.5 MW | Luminace Solar Georgia 2, LLC |
Early County, Georgia has 4 power plants totaling 194 MW of nameplate capacity. Solar is the dominant fuel source at 100% of installed capacity. The largest facility is SR Arlington II at 102 MW. Data comes from EIA Form 860, EIA Form 923, and EPA eGRID federal releases.
To find plants closer to a specific address in Early County, use the address lookup — it shows every plant within a chosen radius along with distance, fuel type, and emissions.