Muscogee County, Georgia has 3 power plants totaling 91 MW of nameplate capacity. Browse every plant below with fuel type, operator, and capacity.
| Plant | City | Fuel | Capacity | Operator |
|---|---|---|---|---|
| Oliver Dam | Columbus | Hydroelectric | 60.0 MW | Georgia Power Co |
| North Highlands | Columbus | Hydroelectric | 29.6 MW | Georgia Power Co |
| Muscogee Public Works | Columbus | Solar | 1.5 MW | Westbound Solar Llc |
Muscogee County, Georgia has 3 power plants totaling 91 MW of nameplate capacity. Hydroelectric is the dominant fuel source at 98% of installed capacity, followed by Solar (2%). The largest facility is Oliver Dam at 60 MW. Data comes from EIA Form 860, EIA Form 923, and EPA eGRID federal releases.
To find plants closer to a specific address in Muscogee County, use the address lookup — it shows every plant within a chosen radius along with distance, fuel type, and emissions.