Lenawee County, Michigan has 5 power plants totaling 64 MW of nameplate capacity. Browse every plant below with fuel type, operator, and capacity.
| Plant | City | Fuel | Nameplate capacity | Operator |
|---|---|---|---|---|
| Cement City Solar, LLC | Cement City | Solar | 20.0 MW | AES Distributed Energy |
| Blue Elk IV Solar, LLC | Adrian | Solar | 20.0 MW | Blue Elk IV Solar, LLC |
| Blue Elk I Solar, LLC | Adrian | Solar | 20.0 MW | Blue Elk I Solar, LLC |
| Adrian Energy Associates LLC | Adrian | Biomass | 2.4 MW | NextEra Renewable Fuels, LLC |
| Hendershot Solar, LLC | Tecumseh | Solar | 2.0 MW | Hendershot Solar, LLC |
Lenawee County, Michigan has 5 power plants totaling 64 MW of nameplate capacity. Solar is the dominant fuel source at 96% of installed capacity, followed by Biomass (4%). The largest facility is Cement City Solar, LLC at 20 MW. Data comes from EIA Form 860, EIA Form 923, and EPA eGRID federal releases.
To find plants closer to a specific address in Lenawee County, use the address lookup — it shows every plant within a chosen radius along with distance, fuel type, and emissions.