Crow Wing County, Minnesota has 3 power plants totaling 10 MW of nameplate capacity. Browse every plant below with fuel type, operator, and capacity.
| Plant | City | Fuel | Nameplate capacity | Operator |
|---|---|---|---|---|
| Brainerd Airport | Brainerd | Solar | 5.8 MW | Onsite Partners, LLC |
| Brainerd Public Utilities | Brainerd | Hydroelectric | 2.9 MW | Brainerd Public Utilities |
| Brainerd Waste Water Plant | Brainerd | Solar | 1.4 MW | Brainerd Solar LLC |
Crow Wing County, Minnesota has 3 power plants totaling 10 MW of nameplate capacity. Solar is the dominant fuel source at 71% of installed capacity, followed by Hydroelectric (29%). The largest facility is Brainerd Airport at 5 MW. Data comes from EIA Form 860, EIA Form 923, and EPA eGRID federal releases.
To find plants closer to a specific address in Crow Wing County, use the address lookup — it shows every plant within a chosen radius along with distance, fuel type, and emissions.