McLeod County, Minnesota has 20 power plants totaling 189 MW of nameplate capacity. Browse every plant below with fuel type, operator, and capacity.
| Plant | City | Fuel | Nameplate capacity | Operator |
|---|---|---|---|---|
| Hutchinson Plant #2 | Hutchinson | Natural Gas | 90.5 MW | Hutchinson Utilities Comm |
| Glencoe | Glencoe | Oil | 39.5 MW | Glencoe Light & Power Comm |
| Hutchinson Plant #1 | Hutchinson | Natural Gas | 28.4 MW | Hutchinson Utilities Comm |
| Andromeda Community Solar | Lester Prairie | Solar | 5.0 MW | Andromeda Community Solar |
| Helen Solar CSG | Plato | Solar | 4.0 MW | Altus Power America Management, LLC |
| Spruce Ridge Gas Recovery | Glencoe | Biomass | 3.2 MW | WM Renewable Energy LLC |
| Montgomery Winsted CSG | Winsted | Solar | 3.0 MW | Minnesota Solar CSG 4, LLC |
| Nautilus Winsted Solar (CSG) | Winsted | Solar | 3.0 MW | Nautilus Solar Solutions |
| Barone CSG | Winstead | Solar | 1.0 MW | Terraform Arcadia |
| Novel Martin Solar One LLC (McLeod) CSG | Lester Prairie | Solar | 1.0 MW | REA Investments, LLC |
| FastSun 7 CSG | Stewart | Solar | 1.0 MW | Altus Power America Management, LLC |
| McLeod Community Solar One LLC CSG | Stewart | Solar | 1.0 MW | Madison Energy Holdings LLC |
| USS Water Fowl Solar LLC CSG | Silver Lake | Solar | 1.0 MW | United States Solar Corporation |
| Honeysuckle Solar, LLC | Lester Prairie | Solar | 1.0 MW | Geronimo Power |
| Plato CSG1, LLC | Glencoe | Solar | 1.0 MW | Nautilus Solar Solutions |
| Stewart CSG1, LLC | Stewart | Solar | 1.0 MW | Nautilus Solar Solutions |
| Helen CSG 1 LLC | Plato | Solar | 1.0 MW | United States Solar Corporation |
| USS Verbena Solar LLC | Stewart | Solar | 1.0 MW | United States Solar Corporation |
| South Garden | Winstead | Solar | 1.0 MW | South Garden LLC |
| Crane Garden | Lester Prairie | Solar | 0.9 MW | Crane Garden LLC |
McLeod County, Minnesota has 20 power plants totaling 189 MW of nameplate capacity. Natural Gas is the dominant fuel source at 63% of installed capacity, followed by Oil (21%) and Solar (14%). The largest facility is Hutchinson Plant #2 at 90 MW. Data comes from EIA Form 860, EIA Form 923, and EPA eGRID federal releases.
To find plants closer to a specific address in McLeod County, use the address lookup — it shows every plant within a chosen radius along with distance, fuel type, and emissions.