Power Plants in Wheatland County, Montana

Wheatland County, Montana has 6 power plants totaling 165 MW of nameplate capacity. Browse every plant below with fuel type, operator, and capacity.

Plants6operating sites
Capacity164 MWnameplate
Generation485.1k MWhannual
Wind 100%

Plant locations

All plants in this county

PlantCityFuelCapacityOperator
Judith Gap Wind Energy CenterHarlowtonWind135 MWInvenergy Services Llc
Musselshell Wind ProjectShawmutWind10.0 MWMusselshell Wind Project Llc
Musselshell Wind Project Two LlcShawmutWind10.0 MWMusselshell Wind Project Two Llc
Two Dot Wind FarmTwo DotWind9.7 MWNorthwestern Energy (Mt Wind/Thermal)
Jawbone Wind ProjectHarlowtonWind— MWTriple Oak Power Llc
Haymaker HybridTwodotWind— MWHaymaker Energy Project Llc

About power generation in Wheatland County

Wheatland County, Montana has 6 power plants totaling 165 MW of nameplate capacity. Wind is the dominant fuel source at 100% of installed capacity. The largest facility is Judith Gap Wind Energy Center at 135 MW. Data comes from EIA Form 860, EIA Form 923, and EPA eGRID federal releases.

To find plants closer to a specific address in Wheatland County, use the address lookup — it shows every plant within a chosen radius along with distance, fuel type, and emissions.