Power Plants Near 05001 — White River Junction, VT
79 power plants within 50 miles of ZIP 05001 (White River Junction, Vermont). Click any plant for capacity, generation, emissions, and generator-level detail.
Centroid: 43.6722, -72.3813 · County: Windsor
| Distance | Plant | Fuel | Capacity | Operator |
|---|---|---|---|---|
| 2.5 mi | Deweys Mill White River Jct., VT | Hydroelectric | 3 MW | Green Mountain Power Corp |
| 3.3 mi | Gmp Solar - Hartford Hartford, VT | Solar | 5 MW | Green Mountain Power Corp |
| 3.9 mi | Wilder Hartford, VT | Hydroelectric | 36 MW | Great River Hydro, Llc |
| 4.2 mi | Mascoma Hydro W. Lebanon, NH | Hydroelectric | 2 MW | Green Mountain Power Corp |
| 5.2 mi | Dartmouth College Heating Plant Hanover, NH | Oil | 7 MW | Dartmouth College |
| 5.7 mi | Ottauquechee Hydro N. Hartland, VT | Hydroelectric | 2 MW | Green Mountain Power Corp |
| 10.1 mi | Sungen Sharon 1 Llc Sharon, VT | Solar | 2 MW | Sungen Sharon 1 Llc |
| 10.8 mi | Elizabeth Mines Solar 1 So. Strafford, VT | Solar | 5 MW | Elizabeth Mines Solar 1, Llc |
| 18.8 mi | Ascutney Weatherfield, VT | Oil | 13 MW | Green Mountain Power Corp |
| 20.7 mi | Lower Village Water Power Project Claremont, NH | Hydroelectric | 1 MW | Sugar River Power Llc |
| 22.2 mi | Coolidge Solar 1, Llc Ludlow, VT | Solar | 20 MW | Coolidge Solar I, Llc |
| 22.7 mi | Wheelabrator Claremont Facility Claremont, NH | Biomass | — | Wheelabrator Environmental Systems |
| 22.7 mi | Ne Renewable Springfield, Llc Springfield, NH | Biomass | 20 MW | Ne Renewable Springfield, Llc |
| 22.9 mi | Cavendish Cavendish, VT | Hydroelectric | 2 MW | Green Mountain Power Corp |
| 24.7 mi | Springfield Bess North Springfield, VT | Other Fossil | 5 MW | Strata Manager, Llc |
| 25.4 mi | Smith (Vt) Bradford, VT | Hydroelectric | 2 MW | Green Mountain Power Corp |
| 28.7 mi | Stafford Hill Solar Hybrid Rutland, VT | Solar | 4 MW | Green Mountain Power Corp |
| 28.7 mi | Pittsford Pittsford, VT | Hydroelectric | 4 MW | Green Mountain Power Corp |
| 28.9 mi | Groton Wind Llc Groton, NH | Wind | 48 MW | Avangrid Power Llc |
| 29.1 mi | Chester Power Partners North Chester, VT | Solar | 2 MW | Altus Power America Management, Llc |
| 29.2 mi | Cold River Road Solar North Clarendon, VT | Solar | 2 MW | Aep Onsite Partners, Llc |
| 29.3 mi | Gray Solar Rutland, VT | Solar | 2 MW | Ecos Energy Llc |
| 29.5 mi | Mackinnon Solar Rutland, VT | Solar | 2 MW | Ecos Energy Llc |
| 29.8 mi | Glen Rutland, VT | Hydroelectric | 2 MW | Green Mountain Power Corp |
| 29.9 mi | Main Street Solar Project Rutland, VT | Solar | 2 MW | Greenbacker Renewable Energy Corporation |
| 29.9 mi | Park St Rutland, VT | Solar | 2 MW | Greenbacker Renewable Energy Corporation |
| 30.2 mi | Clarendon Solar Farm North Clarendon, VT | Solar | 2 MW | Clarendon Solar Farm, Llc |
| 30.9 mi | Rutland Rutland City, VT | Oil | 13 MW | Green Mountain Power Corp |
| 32.4 mi | Williamstown Solar Williamstown, VT | Solar | 2 MW | Cvi Cleancapital Solar 1 Llc |
| 32.6 mi | Lempster Wind Llc Lempster, NH | Wind | 24 MW | Avangrid Power Llc |
| 32.6 mi | Proctor Proctor, VT | Hydroelectric | 7 MW | Green Mountain Power Corp |
| 32.7 mi | Gmp Solar - Williamstown Williamstown, VT | Solar | 5 MW | Green Mountain Power Corp |
| 32.9 mi | Newfound Hydroelectric Bristol, NH | Hydroelectric | 1 MW | Eagle Creek Renewable Energy, Llc |
| 33.0 mi | Mhg Wallingford Wallingford, VT | Solar | 2 MW | Standard Solar |
| 33.6 mi | Ayers Island Bristol, NH | Hydroelectric | 8 MW | Central Rivers Power Nh, Llc |
| 34.2 mi | Er Bone Hill Solar, Llc Northfield, VT | Solar | 1 MW | Greenbacker Renewable Energy Corporation |
| 35.2 mi | Plymouth State College Cogeneration Plymouth, NH | Oil | 3 MW | Plymouth State University |
| 36.2 mi | Bridgewater Power Lp Bridgewater, NH | Biomass | 20 MW | Bridgewater Power Co Lp |
| 37.0 mi | Silver Lake (Vt) Salisbury, VT | Hydroelectric | 2 MW | Green Mountain Power Corp |
| 37.1 mi | Bellows Falls Bellow Falls, VT | Hydroelectric | 41 MW | Great River Hydro, Llc |
| 37.2 mi | Boltonville Hydro Associates Boltonville, VT | Hydroelectric | 1 MW | Boltonville Hydro Associates |
| 39.1 mi | Salisbury Salisbury, VT | Hydroelectric | 1 MW | Green Mountain Power Corp |
| 39.4 mi | Eastman Falls Franklin, NH | Hydroelectric | 6 MW | Central Rivers Power Nh, Llc |
| 40.1 mi | Stevens Mills Dam Franklin, NH | Hydroelectric | 2 MW | Eagle Creek Renewable Energy, Llc |
| 40.4 mi | Dodge Falls Associates Bath, NH | Hydroelectric | 5 MW | Dodge Falls Associates Lp |
| 40.6 mi | Westminster Westminster, VT | Solar | 2 MW | Mn8 Energy Llc |
| 40.7 mi | Er Sand Hill Castleton, VT | Solar | 2 MW | Greenbacker Renewable Energy Corporation |
| 40.7 mi | Ryegate Associates, Llc East Ryegate, VT | Biomass | 22 MW | Ryegate Associates, Llc |
| 41.5 mi | Berlin 5 Berlin, VT | Oil | 42 MW | Green Mountain Power Corp |
| 42.0 mi | Sudbury Solar Sudbury, VT | Solar | 2 MW | Ecos Energy Llc |
| 42.5 mi | Clement Dam Hydro Llc Tilton, NH | Hydroelectric | 2 MW | Eagle Creek Renewable Energy, Llc |
| 42.6 mi | Ball Mountain Hydro Jamaica, VT | Hydroelectric | 2 MW | Eagle Creek Renewable Energy, Llc |
| 43.7 mi | Mcindoes Barnet, VT | Hydroelectric | 10 MW | Great River Hydro, Llc |
| 44.5 mi | Jackman Hillsborough, NH | Hydroelectric | 3 MW | Central Rivers Power Nh, Llc |
| 44.6 mi | Lochmere Hydroelectric Plant Tilton, NH | Hydroelectric | 1 MW | Eagle Creek Renewable Energy, Llc |
| 45.1 mi | Wrightsville Hydro Plant Montpelier, VT | Hydroelectric | 1 MW | Washington Electric Coop - (Vt) |
| 45.1 mi | South Street - Middlebury Middlebury, VT | Solar | 5 MW | Greenbacker Renewable Energy Corporation |
| 45.4 mi | Middlesex 2 Moretown, VT | Hydroelectric | 3 MW | Green Mountain Power Corp |
| 45.7 mi | Hillsborough Hosiery Hillsboro, NH | Hydroelectric | 1 MW | Silverstreet Hydro |
| 45.9 mi | Middlebury College Middlebury, VT | Biomass | 1 MW | Middlebury College Biomass |
| 46.0 mi | Antrim Wind Antrim, NH | Wind | 29 MW | Antrim Wind Energy Llc |
| 46.0 mi | Ehc West Hopkinton West Hopkinton, NH | Hydroelectric | 1 MW | Green Mountain Power Corp |
| 46.4 mi | Carver Falls Hampton, NY | Hydroelectric | 2 MW | Green Mountain Power Corp |
| 46.5 mi | Lower Middlebury Middlebury Lower, VT | Hydroelectric | 2 MW | Green Mountain Power Corp |
| 47.2 mi | Moretown Waterbury, VT | Biomass | 2 MW | Nextera Renewable Fuels, Llc |
| 47.5 mi | Penacook Upper Falls Hydro Penacook, NH | Hydroelectric | 3 MW | Briar-Hydro Associates |
| 47.5 mi | Beldens New Haven, VT | Hydroelectric | 6 MW | Green Mountain Power Corp |
| 47.6 mi | Penacook Lower Falls Boscawen, NH | Hydroelectric | 5 MW | Briar-Hydro Associates |
| 47.6 mi | Marshfield 6 Marshfield, VT | Hydroelectric | 5 MW | Green Mountain Power Corp |
| 47.7 mi | Rolfe Canal Hydro Penacook, NH | Hydroelectric | 4 MW | Briar-Hydro Associates |
| 47.9 mi | Gore Mountain Solar Ii Whitehall, NY | Solar | 2 MW | Gore Mountain Solar Ii, Llc |
| 48.1 mi | Hgs Solar I Whitehall, NY | Solar | 2 MW | Hgs Solar I, Llc |
| 48.3 mi | Wheelabrator Concord Facility Concord, NH | Biomass | 14 MW | Wheelabrator Environmental Systems |
| 48.3 mi | East Barnet Barnet, VT | Hydroelectric | 2 MW | Green Mountain Power Corp |
| 48.9 mi | Comerford Monroe, NH | Hydroelectric | 168 MW | Great River Hydro, Llc |
| 49.0 mi | Huntington Falls Weybridge, VT | Hydroelectric | 6 MW | Green Mountain Power Corp |
| 49.6 mi | Gmp Solar/Storage-Ferrisburgh Hybrid Ferrisburgh, VT | Solar | 7 MW | Green Mountain Power Corp |
| 49.6 mi | Gmp Solar - Panton Hybrid Panton, VT | Solar | 6 MW | Green Mountain Power Corp |
| 49.7 mi | Weybridge Weybridge, VT | Hydroelectric | 3 MW | Green Mountain Power Corp |
Power generation near this area
There are 79 power plants within 50 miles of White River Junction, Vermont (ZIP 05001), with a combined 709 MW of nameplate capacity. Hydroelectric is the most common fuel type in this area with 39 of the 79 nearby plants. The closest plant is Deweys Mill at 2.5 miles.
Nameplate capacity is the maximum output a plant can produce under ideal conditions — actual generation depends on fuel availability, demand, and maintenance schedules. Capacity factor (shown on individual plant pages) measures how much of that theoretical maximum a plant actually delivers over a year. Nuclear plants typically run above 90%; solar and wind range from 20–45% depending on location and weather.
All data comes from federal EIA and EPA releases. For a printable version of this proximity search, use the report link below. To explore all plants in Vermont, visit the Vermont state page.
← Search a different location · Printable proximity report →