Power Plants Near 24282 — Saint Charles, VA
15 power plants within 50 miles of ZIP 24282 (Saint Charles, Virginia). Click any plant for capacity, generation, emissions, and generator-level detail.
Centroid: 36.8315, -83.0518 · County: Lee
| Distance | Plant | Fuel | Nameplate capacity | Operator |
|---|---|---|---|---|
| 17.8 mi | Powell Valley Kyles Ford, TN | Oil | 22 MW | Powell Valley Electric Coop |
| 31.2 mi | Mineral Gap Wise, VA | Solar | 3 MW | Madison Energy Investments LLC |
| 31.8 mi | John Sevier Rogersville, TN | Natural Gas | 997 MW | Tennessee Valley Authority |
| 33.2 mi | Domtar Kingsport Mill Kingsport, TN | Natural Gas | 50 MW | Domtar Paper Co LLC Kingsport Mill |
| 35.4 mi | Tennessee Eastman Operations Kingsport, TN | Other Fossil | 194 MW | Eastman Chemical Co-TN Ops |
| 37.9 mi | Fort Patrick Henry Kingsport, TN | Hydroelectric | 59 MW | Tennessee Valley Authority |
| 39.9 mi | Virginia City Hybrid Energy Center St. Paul, VA | Coal | 668 MW | Virginia Electric & Power Co |
| 41.4 mi | SR Albany, LLC Greenville, TN | Solar | 4 MW | SR Albany, LLC |
| 41.9 mi | SR Washington I, LLC Jonesborough, TN | Solar | 9 MW | SR Washington I, LLC |
| 41.9 mi | SR Greenville I Limestone, TN | Solar | 5 MW | SR Greenville I, LLC |
| 42.0 mi | SR Gray Gray, TN | Solar | 6 MW | SR Gray, LLC |
| 43.5 mi | Boone Dam Kingsport, TN | Hydroelectric | 106 MW | Tennessee Valley Authority |
| 47.6 mi | SR Greenville II Greeneville, TN | Solar | 5 MW | SR Greenville II, LLC |
| 47.6 mi | Clinch River Cleveland, VA | Natural Gas | 475 MW | Appalachian Power Co |
| 49.7 mi | SR Jonesborough Jonesborough, TN | Solar | 4 MW | SR Jonesborough II, LLC |
Power generation near this area
There are 15 power plants within 50 miles of Saint Charles, Virginia (ZIP 24282), with a combined 2,608 MW of nameplate capacity. Solar is the most common fuel type in this area with 7 of the 15 nearby plants. The closest plant is Powell Valley at 17.8 miles.
Nameplate capacity is the maximum output a plant can produce under ideal conditions — actual generation depends on fuel availability, demand, and maintenance schedules. Capacity factor (shown on individual plant pages) measures how much of that theoretical maximum a plant actually delivers over a year. Nuclear plants typically run above 90%; solar and wind range from 20–45% depending on location and weather.
All data comes from federal EIA and EPA releases. For a printable version of this proximity search, use the report link below. To explore all plants in Virginia, visit the Virginia state page.
← Search a different location · Printable proximity report →