Power Plants Near 24315 — Bland, VA
18 power plants within 50 miles of ZIP 24315 (Bland, Virginia). Click any plant for capacity, generation, emissions, and generator-level detail.
Centroid: 37.1376, -81.0201 · County: Bland
| Distance | Plant | Fuel | Capacity | Operator |
|---|---|---|---|---|
| 7.4 mi | May Solar Wytheville, VA | Battery Storage | — | Alpin Holding Llc |
| 12.1 mi | Caden Energix Wytheville Llc Wytheville, VA | Solar | 20 MW | Caden Energix Wytheville Llc |
| 18.0 mi | New River Dublin, VA | Biomass | 5 MW | Ingenco Renewable Development, Llc |
| 18.3 mi | Glen Lyn Glen Lyn, VA | Coal | — | Appalachian Power Co |
| 18.3 mi | Hecate Energy Pulaski 1 Dublin, VA | Solar | — | Aes Clean Energy |
| 20.0 mi | Celanese Acetate Llc Narrows, VA | Natural Gas | 27 MW | Celanese Acetate Llc |
| 20.7 mi | Wythe County Solar Wythe County, VA | Solar | — | Consolidated Edison Development Inc. |
| 23.2 mi | Buck Hydro Ivanhoe, VA | Hydroelectric | 8 MW | Appalachian Power Co |
| 24.4 mi | Claytor Radford, VA | Hydroelectric | 75 MW | Appalachian Power Co |
| 24.8 mi | Byllesby 2 Ivanhoe, VA | Hydroelectric | 22 MW | Appalachian Power Co |
| 25.0 mi | Radford Radford, VA | Hydroelectric | 1 MW | City Of Radford - (Va) |
| 26.5 mi | Radford Army Ammunition Plant Radford, VA | Natural Gas | 18 MW | U.s. Army - Radford |
| 28.9 mi | Issa Solar Hillsville, VA | Battery Storage | — | Alpin Holding Llc |
| 29.3 mi | Fries Hydroelectric Project Fries, VA | Hydroelectric | 5 MW | Central Rivers Power Us, Llc |
| 30.5 mi | River Trail Solar, Llc Galax, VA | Solar | — | River Trail Solar, Llc |
| 33.6 mi | Virginia Tech Power Plant Blacksburg, VA | Natural Gas | 6 MW | Virginia Polytechnic Inst And State Unv |
| 45.4 mi | Pinnacles Ararat, VA | Hydroelectric | 12 MW | Northbrook Virginia Hydro, Llc |
| 47.5 mi | New River Clean Energy Beckley, WV | Biomass | 3 MW | Cox Enterprises |
← Search a different location · Printable proximity report →