Power Plants Near 25202 — Tornado, WV

18 power plants within 50 miles of ZIP 25202 (Tornado, West Virginia). Click any plant for capacity, generation, emissions, and generator-level detail.

Centroid: 38.3357, -81.8476 · County: Kanawha

Coal 76%Natural Gas 22%Hydroelectric 2%
DistancePlantFuelCapacityOperator
9.6 miJohn E Amos
St Albans, WV
Coal2,933 MWAppalachian Power Co
13.7 miWinfield
Winfield, WV
Hydroelectric25 MWAppalachian Power Co
15.2 miAep Milton Nas
Milton, WV
Battery StorageAppalachian Power Co
16.1 miMarmet
Marmet, WV
Hydroelectric14 MWAppalachian Power Co
24.8 miKanawha River
Glasgow, WV
CoalAppalachian Power Co
27.7 miLondon
Handley, WV
Hydroelectric14 MWAppalachian Power Co
36.7 miGlen Ferris Hydro
Gauley Bridge, WV
Hydroelectric6 MWHawks Nest Hydro Llc
37.3 miCeredo Generating Station
Huntington, WV
Natural Gas519 MWAppalachian Power Co
38.7 miHawks Nest Hydro
Gauley Bridge, WV
Hydroelectric102 MWHawks Nest Hydro Llc
40.2 miRacine
Racine, OH
Hydroelectric47 MWEagle Creek Renewable Energy, Llc
40.4 miBig Sandy Peaker Plant
Kenona, WV
Natural Gas353 MWMiddle River Power Ii, Llc
42.3 miRiverside Generating Llc
Catlettsburg, KY
Natural Gas1,150 MWRiverside Generating Co Llc
42.8 miKyger Creek
Cheshire, OH
Coal1,087 MWOhio Valley Electric Corp
43.3 miBig Sandy
Louisa, KY
Natural Gas281 MWKentucky Power Co
43.8 miPhilip Sporn
Graham Station, WV
CoalAppalachian Power Co
43.8 miGavin Power, Llc
Cheshire, OH
Coal2,600 MWGavin Power, Llc
44.7 miMountaineer
New Haven, WV
Coal1,300 MWAppalachian Power Co
46.3 miGreat Bend Solar Project
Portland, OH
SolarGreat Bend Solar Llc

Power generation near this area

There are 18 power plants within 50 miles of Tornado, West Virginia (ZIP 25202), with a combined 10,431 MW of nameplate capacity. Coal is the most common fuel type in this area with 6 of the 18 nearby plants. The closest plant is John E Amos at 9.6 miles.

Nameplate capacity is the maximum output a plant can produce under ideal conditions — actual generation depends on fuel availability, demand, and maintenance schedules. Capacity factor (shown on individual plant pages) measures how much of that theoretical maximum a plant actually delivers over a year. Nuclear plants typically run above 90%; solar and wind range from 20–45% depending on location and weather.

All data comes from federal EIA and EPA releases. For a printable version of this proximity search, use the report link below. To explore all plants in West Virginia, visit the West Virginia state page.

← Search a different location · Printable proximity report →