Power Plants Near 30708 — Cisco, GA

30 power plants within 50 miles of ZIP 30708 (Cisco, Georgia). Click any plant for capacity, generation, emissions, and generator-level detail.

Centroid: 34.9618, -84.6646 · County: Murray

Nuclear 51%Hydroelectric 30%Natural Gas 12%Battery Storage 5%
DistancePlantFuelNameplate capacityOperator
9.2 miOcoee 1
Benton, TN
Hydroelectric19 MWTennessee Valley Authority
12.9 miOcoee 2
Benton, TN
Hydroelectric23 MWTennessee Valley Authority
12.9 miOcoee 3
Benton, TN
Hydroelectric29 MWTennessee Valley Authority
15.7 miMurray Treadwell Farms
Chatsworth, GA
Solar3 MWSafari Energy, LLC
15.9 miWhitfield Cooper
Cohutta, GA
Solar1 MWWestbound Solar 3, LLC
22.3 miBlue Ridge
Blue Ridge, GA
Hydroelectric24 MWTennessee Valley Authority
22.6 miThomas A Smith Energy Facility
Dalton, GA
Natural Gas1,192 MWOglethorpe Power Corporation
22.7 miDalton 2
Dalton, GA
Solar7 MWGeorgia Power Co
24.2 miCarters
Chatsworth, GA
Hydroelectric500 MWUSCE-Mobile District
25.3 miApalachia
Reliance, TN
Hydroelectric94 MWTennessee Valley Authority
27.8 miVolkswagen Solar System
Chattanooga, TN
Solar8 MWSR Enterprise South, LLC
28.3 miCS Murphy Point, LLC
Murphy, NC
Solar1 MWDeriva Energy
28.8 miMurphy Farm Power, LLC
Culberson, NC
Solar1 MWDeriva Energy
30.3 miSequoyah
Soddy Daisy, TN
Nuclear2,441 MWTennessee Valley Authority
30.5 miHiwassee Dam
Murphy, NC
Hydroelectric166 MWTennessee Valley Authority
31.1 miChattanooga Metropolitan Airport Solar
Chattanooga, TN
Solar3 MWChattanooga Metropolitan Airport
32.7 miNottely
Blairsville, GA
Hydroelectric16 MWTennessee Valley Authority
33.4 miChickamauga
Chattanooga, TN
Hydroelectric160 MWTennessee Valley Authority
35.9 miDMAT Denso - SEAT Solar Holdings, LLC
Athens, TN
Solar5 MWSolarity Aggregator, LLC
36.0 miGordon Thompson
Fairmount, GA
Solar3 MWWestbound Solar 3, LLC
36.1 miGordon Pine Hall
Fairmount, GA
Solar2 MWWestbound Solar 3, LLC
37.0 miMartins Creek Solar NC, LLC
Murphy, NC
Solar1 MWDeriva Energy
41.4 miRaccoon Mountain
Chattanooga, TN
Hydroelectric1,714 MWTennessee Valley Authority
42.4 miMission
Murphy, NC
Hydroelectric2 MWNorthbrook Carolina Hydro II, LLC
44.8 miWatts Bar Nuclear Plant
Spring City, TN
Nuclear2,540 MWTennessee Valley Authority
46.0 miWatts Bar Hydro
Spring City, TN
Hydroelectric175 MWTennessee Valley Authority
48.0 miMcGrau Ford Battery Storage Facility
Ball Ground, GA
Battery Storage530 MWGeorgia Power Co
48.7 miSR Sequatchie
Dunlap, TN
Solar8 MWSR Sequatchie, LLC
49.6 miBartow Davidson
Cartersville, GA
Solar3 MWMadison Energy Holdings LLC
49.6 miChatuge
Hayesville, NC
Hydroelectric13 MWTennessee Valley Authority

Power generation near this area

There are 30 power plants within 50 miles of Cisco, Georgia (ZIP 30708), with a combined 9,680 MW of nameplate capacity. Hydroelectric is the most common fuel type in this area with 13 of the 30 nearby plants. The closest plant is Ocoee 1 at 9.2 miles.

Nameplate capacity is the maximum output a plant can produce under ideal conditions — actual generation depends on fuel availability, demand, and maintenance schedules. Capacity factor (shown on individual plant pages) measures how much of that theoretical maximum a plant actually delivers over a year. Nuclear plants typically run above 90%; solar and wind range from 20–45% depending on location and weather.

All data comes from federal EIA and EPA releases. For a printable version of this proximity search, use the report link below. To explore all plants in Georgia, visit the Georgia state page.

← Search a different location · Printable proximity report →