Power Plants Near 31598 — Jesup, GA

21 power plants within 50 miles of ZIP 31598 (Jesup, Georgia). Click any plant for capacity, generation, emissions, and generator-level detail.

Centroid: 31.5782, -81.8802 · County: Wayne

Nuclear 63%Oil 19%Solar 13%Biomass 5%
DistancePlantFuelNameplate capacityOperator
3.5 miWestberry Jesup
Jesup, GA
Solar3 MWWestbound Solar LLC
6.0 miJesup Plant
Jesup, GA
Biomass70 MWRayonier Advanced Materials
28.1 miFort Stewart Solar Facility
Fort Stewart, GA
Solar30 MWGeorgia Power Co
32.0 miMcManus
Brunswick, GA
Oil560 MWGeorgia Power Co
33.5 miPierce Eunice
Blackshear, GA
Solar2 MWWestbound Solar 3, LLC
33.8 miBaxley
Baxley, GA
Solar25 MWSR Baxley, LLC
34.8 miSolar Glynn
Brunswick, GA
Solar18 MWCypress Creek Renewables
35.2 miBrunswick Cellulose
Brunswick, GA
Biomass72 MWBrunswick Cellulose LLC
35.3 miCurry Solar
Reidsville, GA
Solar1 MWAltus Power America Management, LLC
36.7 miEdwin I Hatch
Baxley, GA
Nuclear1,848 MWGeorgia Power Co
36.8 miReidsville Renewables, Inc.
Reidsville, GA
Solar3 MWSafari Energy, LLC
37.1 miWare Avra I
Waycross, GA
Solar3 MWSafari Energy, LLC
37.1 miWare Avra II
Waycross, GA
Solar2 MWSafari Energy, LLC
40.2 miBryan Floyd
Pembroke, GA
Solar2 MWMadison Energy Holdings LLC
43.9 miSR Hazlehurst
Hazlehurst, GA
Solar20 MWSR Hazlehurst, LLC
45.6 miHazlehurst II
Hazlehurst, GA
Solar53 MWSR South Loving, LLC
45.7 miBlackwater Solar
Bickley, GA
Solar80 MWBlackwater Solar, LLC
45.9 miHazlehurst III
Hazlehurst, GA
Solar40 MWSR Hazlehurst III, LLC
46.0 miFountain Folkston
Folkston, GA
Solar2 MWWestbound Solar LLC
47.4 miSuperior Landfill Gas Recovery
Savannah, GA
Biomass6 MWWM Renewable Energy LLC
50.0 miSR Snipesville II
Denton, GA
Solar107 MWSR Snipesville II, LLC

Power generation near this area

There are 21 power plants within 50 miles of Jesup, Georgia (ZIP 31598), with a combined 2,946 MW of nameplate capacity. Solar is the most common fuel type in this area with 16 of the 21 nearby plants. The closest plant is Westberry Jesup at 3.5 miles.

Nameplate capacity is the maximum output a plant can produce under ideal conditions — actual generation depends on fuel availability, demand, and maintenance schedules. Capacity factor (shown on individual plant pages) measures how much of that theoretical maximum a plant actually delivers over a year. Nuclear plants typically run above 90%; solar and wind range from 20–45% depending on location and weather.

All data comes from federal EIA and EPA releases. For a printable version of this proximity search, use the report link below. To explore all plants in Georgia, visit the Georgia state page.

← Search a different location · Printable proximity report →