Power Plants Near 37074 — Hartsville, TN
15 power plants within 50 miles of ZIP 37074 (Hartsville, Tennessee). Click any plant for capacity, generation, emissions, and generator-level detail.
Centroid: 36.3947, -86.1704 · County: Trousdale
| Distance | Plant | Fuel | Nameplate capacity | Operator |
|---|---|---|---|---|
| 13.9 mi | Gallatin (TN) Gallatin, TN | Coal | 1,918 MW | Tennessee Valley Authority |
| 14.5 mi | Cordell Hull Carthage, TN | Hydroelectric | 100 MW | USCE-Nashville District |
| 27.8 mi | Old Hickory Hendersonville, TN | Hydroelectric | 104 MW | USCE-Nashville District |
| 28.1 mi | Center Hill Lancaster, TN | Hydroelectric | 156 MW | USCE-Nashville District |
| 29.9 mi | J P Priest Nashville, TN | Hydroelectric | 28 MW | USCE-Nashville District |
| 30.3 mi | SR Warren, LLC Franklin, KY | Solar | 4 MW | SR Warren, LLC |
| 30.4 mi | SR Franklin, LLC Franklin, KY | Solar | 3 MW | SR Franklin, LLC |
| 31.8 mi | Opryland USA Nashville, TN | Natural Gas | 5 MW | Gaylord Entertainment Co |
| 33.6 mi | Music City Community Solar Madison, TN | Solar | 2 MW | Nashville Electric Service |
| 39.1 mi | MTSU Power Co-Gen Plant Murfreesboro, TN | Natural Gas | 5 MW | Middle Tennessee State University |
| 39.3 mi | Vanderbilt University Power Plant Nashville, TN | Natural Gas | 19 MW | Vanderbilt University |
| 41.1 mi | Dale Hollow Celina, TN | Hydroelectric | 54 MW | USCE-Nashville District |
| 42.6 mi | Glasgow LFGTE Glasgow, KY | Biomass | 1 MW | East Kentucky Power Coop, Inc |
| 43.3 mi | Glover Creek Solar, LLC Summer Shade, KY | Solar | 55 MW | Glover Creek Solar, LLC |
| 49.2 mi | SR Christiana, LLC Christiana, TN | Solar | 3 MW | SR Christiana, LLC |
Power generation near this area
There are 15 power plants within 50 miles of Hartsville, Tennessee (ZIP 37074), with a combined 2,455 MW of nameplate capacity. Hydroelectric is the most common fuel type in this area with 5 of the 15 nearby plants. The closest plant is Gallatin (TN) at 13.9 miles.
Nameplate capacity is the maximum output a plant can produce under ideal conditions — actual generation depends on fuel availability, demand, and maintenance schedules. Capacity factor (shown on individual plant pages) measures how much of that theoretical maximum a plant actually delivers over a year. Nuclear plants typically run above 90%; solar and wind range from 20–45% depending on location and weather.
All data comes from federal EIA and EPA releases. For a printable version of this proximity search, use the report link below. To explore all plants in Tennessee, visit the Tennessee state page.