Power Plants Near 37180 — Unionville, TN
14 power plants within 50 miles of ZIP 37180 (Unionville, Tennessee). Click any plant for capacity, generation, emissions, and generator-level detail.
Centroid: 35.6224, -86.5639 · County: Bedford
| Distance | Plant | Fuel | Nameplate capacity | Operator |
|---|---|---|---|---|
| 6.9 mi | SR Bell Buckle Shelbyville, TN | Solar | 35 MW | SR Bell Buckle, LLC |
| 12.3 mi | SR Christiana, LLC Christiana, TN | Solar | 3 MW | SR Christiana, LLC |
| 19.4 mi | MTSU Power Co-Gen Plant Murfreesboro, TN | Natural Gas | 5 MW | Middle Tennessee State University |
| 33.5 mi | Tims Ford Winchester, TN | Hydroelectric | 46 MW | Tennessee Valley Authority |
| 37.0 mi | J P Priest Nashville, TN | Hydroelectric | 28 MW | USCE-Nashville District |
| 38.6 mi | Vanderbilt University Power Plant Nashville, TN | Natural Gas | 19 MW | Vanderbilt University |
| 40.9 mi | Elora Solar Elora, TN | Solar | 150 MW | Elora Solar |
| 41.3 mi | Opryland USA Nashville, TN | Natural Gas | 5 MW | Gaylord Entertainment Co |
| 44.5 mi | Music City Community Solar Madison, TN | Solar | 2 MW | Nashville Electric Service |
| 45.3 mi | SR Hickman Lyles, TN | Solar | 6 MW | SR Hickman, LLC |
| 46.4 mi | McMinnville McMinnville, TN | Oil | 24 MW | McMinnville Electric System |
| 46.9 mi | Old Hickory Hendersonville, TN | Hydroelectric | 104 MW | USCE-Nashville District |
| 48.8 mi | Gallatin (TN) Gallatin, TN | Coal | 1,918 MW | Tennessee Valley Authority |
| 49.5 mi | Cumblerland Land Holdings, LLC Elkmont, AL | Solar | 15 MW | Cumberland Land Holdings, LLC |
Power generation near this area
There are 14 power plants within 50 miles of Unionville, Tennessee (ZIP 37180), with a combined 2,358 MW of nameplate capacity. Solar is the most common fuel type in this area with 6 of the 14 nearby plants. The closest plant is SR Bell Buckle at 6.9 miles.
Nameplate capacity is the maximum output a plant can produce under ideal conditions — actual generation depends on fuel availability, demand, and maintenance schedules. Capacity factor (shown on individual plant pages) measures how much of that theoretical maximum a plant actually delivers over a year. Nuclear plants typically run above 90%; solar and wind range from 20–45% depending on location and weather.
All data comes from federal EIA and EPA releases. For a printable version of this proximity search, use the report link below. To explore all plants in Tennessee, visit the Tennessee state page.
← Search a different location · Printable proximity report →