Power Plants Near 37324 — Decherd, TN

18 power plants within 50 miles of ZIP 37324 (Decherd, Tennessee). Click any plant for capacity, generation, emissions, and generator-level detail.

Centroid: 35.2326, -86.0589 · County: Franklin

Hydroelectric 88%Solar 10%
DistancePlantFuelCapacityOperator
5.2 miFranklin (Tn)
Estill Springs, TN
Natural GasTennessee Valley Authority
12.6 miTims Ford
Winchester, TN
Hydroelectric46 MWTennessee Valley Authority
15.0 miSr Tullahoma
Tullahoma, TN
SolarSr Tullahoma, Llc
19.9 miElora Solar
Elora, TN
Solar150 MWElora Solar
29.4 miNickajack
New Hope, TN
Hydroelectric104 MWTennessee Valley Authority
29.6 miWidows Creek
Stevenson, AL
CoalTennessee Valley Authority
32.5 miSr Bell Buckle
Shelbyville, TN
Solar35 MWSr Bell Buckle, Llc
36.7 miSr Christiana, Llc
Christiana, TN
SolarSr Christiana, Llc
36.9 miBellefonte
Hollywood, AL
Oil14 MWTennessee Valley Authority
37.1 miMcminnville
Mcminnville, TN
Oil24 MWMcminnville Electric System
39.6 miSr Marion, Llc
Dunlap, TN
Solar1 MWSr Marion, Llc
39.8 miRaccoon Mountain
Chattanooga, TN
Hydroelectric1,714 MWTennessee Valley Authority
42.7 miTai Huntsville Solar Hybrid
Huntsville, AL
Solar32 MWTai Huntsville Solar, Llc
43.1 miSr Sequatchie
Dunlap, TN
SolarSr Sequatchie, Llc
46.1 miMtsu Power Co-Gen Plant
Murfreesboro, TN
Natural Gas5 MWMiddle Tennessee State University
46.3 miGreat Falls (Tn)
Rock Island, TN
Hydroelectric34 MWTennessee Valley Authority
47.7 miChickamauga
Chattanooga, TN
Hydroelectric160 MWTennessee Valley Authority
49.7 miCumblerland Land Holdings, Llc
Elkmont, AL
Solar15 MWCumberland Land Holdings, Llc

Power generation near this area

There are 18 power plants within 50 miles of Decherd, Tennessee (ZIP 37324), with a combined 2,333 MW of nameplate capacity. Solar is the most common fuel type in this area with 8 of the 18 nearby plants. The closest plant is Franklin (Tn) at 5.2 miles.

Nameplate capacity is the maximum output a plant can produce under ideal conditions — actual generation depends on fuel availability, demand, and maintenance schedules. Capacity factor (shown on individual plant pages) measures how much of that theoretical maximum a plant actually delivers over a year. Nuclear plants typically run above 90%; solar and wind range from 20–45% depending on location and weather.

All data comes from federal EIA and EPA releases. For a printable version of this proximity search, use the report link below. To explore all plants in Tennessee, visit the Tennessee state page.

← Search a different location · Printable proximity report →