Power Plants Near 38271 — Woodland Mills, TN
17 power plants within 50 miles of ZIP 38271 (Woodland Mills, Tennessee). Click any plant for capacity, generation, emissions, and generator-level detail.
Centroid: 36.4583, -89.2332 · County: Obion
| Distance | Plant | Fuel | Capacity | Operator |
|---|---|---|---|---|
| 14.3 mi | Oetn1 Obion, TN | Solar | 100 MW | Oe_tn1 |
| 16.5 mi | Ridgely Energy Farm Ridgely, TN | Solar | — | Leeward Asset Management, Llc |
| 18.7 mi | New Madrid New Madrid, MO | Coal | 1,300 MW | Associated Electric Coop, Inc |
| 36.1 mi | Coleman Sikeston, MO | Oil | — | City Of Sikeston - (Mo) |
| 36.2 mi | Sikeston Power Station Sikeston, MO | Coal | 261 MW | City Of Sikeston - (Mo) |
| 37.6 mi | Gleason Generating Facility Gleason, TN | Natural Gas | 568 MW | Tennessee Valley Authority |
| 39.1 mi | Sr Trenton Trenton, TN | Solar | — | Sr Trenton, Llc |
| 41.3 mi | Malden Malden, MO | Oil | 16 MW | City Of Malden - (Mo) |
| 43.4 mi | Mayfield Solar And Storage Mayfield, KY | Solar | — | Brightnight Power |
| 44.0 mi | Essex Essex, MO | Natural Gas | 121 MW | Associated Electric Coop, Inc |
| 44.2 mi | Sr Milan Milan, TN | Solar | — | Sr Milan, Llc |
| 46.5 mi | Sr Trezevant Trezevant, TN | Solar | — | Sr Trezevant, Llc |
| 47.4 mi | Morley Solar Morley, MO | Solar | — | Leeward Asset Management, Llc |
| 48.1 mi | Kennett Kennett, MO | Natural Gas | 31 MW | City Of Kennett - (Mo) |
| 48.5 mi | Crooked Lake Solar, Llc Blytheville, AR | Solar | 175 MW | Crooked Lake Solar, Llc |
| 49.0 mi | Kennett Solar Kennett, MO | Solar | — | Evergy Kansas Central, Inc |
| 49.4 mi | Sr South Gibson Medina, TN | Solar | — | Sr South Gibson, Llc |
Power generation near this area
There are 17 power plants within 50 miles of Woodland Mills, Tennessee (ZIP 38271), with a combined 2,572 MW of nameplate capacity. Solar is the most common fuel type in this area with 10 of the 17 nearby plants. The closest plant is Oetn1 at 14.3 miles.
Nameplate capacity is the maximum output a plant can produce under ideal conditions — actual generation depends on fuel availability, demand, and maintenance schedules. Capacity factor (shown on individual plant pages) measures how much of that theoretical maximum a plant actually delivers over a year. Nuclear plants typically run above 90%; solar and wind range from 20–45% depending on location and weather.
All data comes from federal EIA and EPA releases. For a printable version of this proximity search, use the report link below. To explore all plants in Tennessee, visit the Tennessee state page.
← Search a different location · Printable proximity report →