Power Plants Near 42051 — Hickory, KY
15 power plants within 50 miles of ZIP 42051 (Hickory, Kentucky). Click any plant for capacity, generation, emissions, and generator-level detail.
Centroid: 36.8478, -88.6788 · County: Graves
| Distance | Plant | Fuel | Nameplate capacity | Operator |
|---|---|---|---|---|
| 13.3 mi | PPS Power Plant No 1 Paducah, KY | Natural Gas | 120 MW | Paducah Power System |
| 20.0 mi | Marshall Energy Facility Calvert City, KY | Natural Gas | 688 MW | Tennessee Valley Authority |
| 21.7 mi | Shawnee West Paducah, KY | Coal | 1,575 MW | Tennessee Valley Authority |
| 22.7 mi | Calvert City Calvert City, KY | Natural Gas | 27 MW | DTE Calvert City LLC |
| 25.3 mi | Kentucky Dam Grand Rivers, KY | Hydroelectric | 219 MW | Tennessee Valley Authority |
| 26.4 mi | Smithland Hydroelectric Plant Smithland, KY | Hydroelectric | 76 MW | American Mun Power-Ohio, Inc |
| 28.0 mi | Barkley Kuttawa, KY | Hydroelectric | 130 MW | USCE-Nashville District |
| 32.2 mi | Mound City Solar Mound City, IL | Solar | 5 MW | Mound City Solar PV |
| 32.5 mi | Pulaski Solar Grand Chain, IL | Solar | 417 MW | Joppa BESS LLC |
| 33.9 mi | SR Paris Paris, TN | Solar | 7 MW | SR Paris, LLC |
| 35.2 mi | Ashwood Solar I Eddyville, KY | Solar | 86 MW | RWE Clean Energy |
| 36.3 mi | Oetn1 Obion, TN | Solar | 100 MW | Oe_tn1 |
| 41.8 mi | Gleason Generating Facility Gleason, TN | Natural Gas | 568 MW | Tennessee Valley Authority |
| 48.5 mi | Kelso Solar Benton, MO | Solar | 200 MW | Kelso Solar, LLC |
| 48.5 mi | Kelso 2 Solar Benton, MO | Solar | 149 MW | Kelso 2 Solar, LLC |
Power generation near this area
There are 15 power plants within 50 miles of Hickory, Kentucky (ZIP 42051), with a combined 4,366 MW of nameplate capacity. Solar is the most common fuel type in this area with 7 of the 15 nearby plants. The closest plant is PPS Power Plant No 1 at 13.3 miles.
Nameplate capacity is the maximum output a plant can produce under ideal conditions — actual generation depends on fuel availability, demand, and maintenance schedules. Capacity factor (shown on individual plant pages) measures how much of that theoretical maximum a plant actually delivers over a year. Nuclear plants typically run above 90%; solar and wind range from 20–45% depending on location and weather.
All data comes from federal EIA and EPA releases. For a printable version of this proximity search, use the report link below. To explore all plants in Kentucky, visit the Kentucky state page.
← Search a different location · Printable proximity report →