Power Plants Near 42061 — Lowes, KY
17 power plants within 50 miles of ZIP 42061 (Lowes, Kentucky). Click any plant for capacity, generation, emissions, and generator-level detail.
Centroid: 36.8862, -88.7728 · County: Graves
| Distance | Plant | Fuel | Capacity | Operator |
|---|---|---|---|---|
| 6.3 mi | Mayfield Solar And Storage Mayfield, KY | Solar | — | Brightnight Power |
| 13.4 mi | Pps Power Plant No 1 Paducah, KY | Natural Gas | 120 MW | Paducah Power System |
| 14.5 mi | Gage Solar Paducah, KY | Solar | — | Ggso, Llc |
| 18.3 mi | Shawnee West Paducah, KY | Coal | 1,575 MW | Tennessee Valley Authority |
| 23.0 mi | Marshall Energy Facility Calvert City, KY | Natural Gas | 688 MW | Tennessee Valley Authority |
| 25.7 mi | Calvert City Calvert City, KY | Natural Gas | 27 MW | Dte Calvert City Llc |
| 27.6 mi | Smithland Hydroelectric Plant Smithland, KY | Hydroelectric | 76 MW | American Mun Power-Ohio, Inc |
| 28.0 mi | Pulaski Solar Grand Chain, IL | Solar | — | Joppa Bess Llc |
| 29.2 mi | Kentucky Dam Grand Rivers, KY | Hydroelectric | 219 MW | Tennessee Valley Authority |
| 31.9 mi | Barkley Kuttawa, KY | Hydroelectric | 130 MW | Usce-Nashville District |
| 36.6 mi | Oetn1 Obion, TN | Solar | 100 MW | Oe_tn1 |
| 39.2 mi | Sr Paris Paris, TN | Solar | 7 MW | Sr Paris, Llc |
| 39.4 mi | Ashwood Solar I Eddyville, KY | Solar | — | Big Sky Wind, Llc |
| 39.9 mi | Sr Puryear Puryear, TN | Solar | — | Sr Puryear, Llc |
| 45.2 mi | Gleason Generating Facility Gleason, TN | Natural Gas | 568 MW | Tennessee Valley Authority |
| 46.9 mi | Sikeston Power Station Sikeston, MO | Coal | 261 MW | City Of Sikeston - (Mo) |
| 46.9 mi | Coleman Sikeston, MO | Oil | — | City Of Sikeston - (Mo) |
Power generation near this area
There are 17 power plants within 50 miles of Lowes, Kentucky (ZIP 42061), with a combined 3,770 MW of nameplate capacity. Solar is the most common fuel type in this area with 7 of the 17 nearby plants. The closest plant is Mayfield Solar And Storage at 6.3 miles.
Nameplate capacity is the maximum output a plant can produce under ideal conditions — actual generation depends on fuel availability, demand, and maintenance schedules. Capacity factor (shown on individual plant pages) measures how much of that theoretical maximum a plant actually delivers over a year. Nuclear plants typically run above 90%; solar and wind range from 20–45% depending on location and weather.
All data comes from federal EIA and EPA releases. For a printable version of this proximity search, use the report link below. To explore all plants in Kentucky, visit the Kentucky state page.
← Search a different location · Printable proximity report →