Power Plants Near 42431 — Madisonville, KY

18 power plants within 50 miles of ZIP 42431 (Madisonville, Kentucky). Click any plant for capacity, generation, emissions, and generator-level detail.

Centroid: 37.3256, -87.4953 · County: Hopkins

Coal 55%Natural Gas 28%Solar 11%Hydroelectric 4%
DistancePlantFuelNameplate capacityOperator
22.1 miR D Green
Robards, KY
Natural Gas586 MWBig Rivers Electric Corp
22.1 miRobert A Reid
Robards, KY
Other Fossil99 MWBig Rivers Electric Corp
22.8 miUnbridled Solar
Robards, KY
Solar160 MWGeronimo Power
24.3 miD B Wilson
Centertown, KY
Coal509 MWBig Rivers Electric Corp
25.6 miSebree Solar I
Robards, KY
Solar250 MWSebree Solar, LLC
26.6 miSebree Solar II
Robards, KY
Solar150 MWSebree Solar, LLC
28.8 miParadise
Drakesboro, KY
Natural Gas1,854 MWTennessee Valley Authority
38.4 miAshwood Solar I
Eddyville, KY
Solar86 MWRWE Clean Energy
41.5 miF B Culley
Newburgh, IN
Coal369 MWSouthern Indiana Gas & Elec Co
41.7 miWarrick
Newburgh, IN
Coal823 MWAGC Division of APGI Inc
41.8 miA B Brown
Mount Vernon, IN
Coal647 MWSouthern Indiana Gas & Elec Co
43.5 miPosey Solar
Mount Vernon, IN
Solar191 MWSouthern Indiana Gas & Elec Co
45.1 miBarkley
Kuttawa, KY
Hydroelectric130 MWUSCE-Nashville District
45.9 miOak Hill Solar Array
Evansville, IN
Solar2 MWSouthern Indiana Gas & Elec Co
46.8 miSABIC Innovative Plastics Mt. Vernon
Mount Vernon, IN
Natural Gas108 MWSABIC IP Mt. Vernon, LLC
47.6 miSR Russellville
Olmstead, KY
Solar173 MWSR Russellville, LLC
47.8 miKentucky Dam
Grand Rivers, KY
Hydroelectric219 MWTennessee Valley Authority
48.4 miRockport
Rockport, IN
Coal2,600 MWIndiana Michigan Power Co

Power generation near this area

There are 18 power plants within 50 miles of Madisonville, Kentucky (ZIP 42431), with a combined 8,955 MW of nameplate capacity. Solar is the most common fuel type in this area with 7 of the 18 nearby plants. The closest plant is R D Green at 22.1 miles.

Nameplate capacity is the maximum output a plant can produce under ideal conditions — actual generation depends on fuel availability, demand, and maintenance schedules. Capacity factor (shown on individual plant pages) measures how much of that theoretical maximum a plant actually delivers over a year. Nuclear plants typically run above 90%; solar and wind range from 20–45% depending on location and weather.

All data comes from federal EIA and EPA releases. For a printable version of this proximity search, use the report link below. To explore all plants in Kentucky, visit the Kentucky state page.

← Search a different location · Printable proximity report →