Power Plants Near 75925 — Alto, TX
14 power plants within 50 miles of ZIP 75925 (Alto, Texas). Click any plant for capacity, generation, emissions, and generator-level detail.
Centroid: 31.6103, -95.0762 · County: Cherokee
| Distance | Plant | Fuel | Capacity | Operator |
|---|---|---|---|---|
| 17.2 mi | Middlebrook Creek Solar And Bess Nacogdoches, TX | Solar | — | Solar Proponent Llc |
| 18.5 mi | Nacogdoches Power Cushing, TX | Biomass | 114 MW | Austin Energy |
| 18.7 mi | Azalea Springs Solar Park Lufkin, TX | Solar | — | Azalea Springs Solar Park Llc |
| 23.3 mi | Stryker Creek Jacksonville, TX | Natural Gas | 713 MW | Luminant Generation Company Llc |
| 28.3 mi | Pinecrest Energy Center Lufkin, TX | Natural Gas | — | Coronado Power Ventures Llc |
| 28.7 mi | Crockett Crockett, TX | Battery Storage | — | Engie North America |
| 30.2 mi | Sun Angel Ess Lufkin, TX | Battery Storage | — | Sun Angel Ess Llc |
| 30.2 mi | Lufkin South Bess Lufkin, TX | Battery Storage | 10 MW | Hen Infrastructure, L.l.c. |
| 33.1 mi | Diboll Bess Diboll, TX | Battery Storage | 10 MW | Hen Infrastructure, L.l.c. |
| 38.9 mi | Tenaska Gateway Generating Station Mt. Enterprise, TX | Natural Gas | 940 MW | Tenaska Gateway Partners Ltd |
| 39.1 mi | Houston County Bess Crockett, TX | Battery Storage | — | Ric Development, Llc |
| 39.4 mi | Brotherton Storage Palestine, TX | Battery Storage | — | Belltown Power Texas 2, Llc |
| 46.1 mi | Oak Hill - Dry Creek Henderson, TX | Solar | — | Vistra Zero Llc |
| 48.7 mi | Musgravite Solar Tbd, TX | Solar | — | Bt Thompson Solar, Llc |
Power generation near this area
There are 14 power plants within 50 miles of Alto, Texas (ZIP 75925), with a combined 1,787 MW of nameplate capacity. Battery Storage is the most common fuel type in this area with 6 of the 14 nearby plants. The closest plant is Middlebrook Creek Solar And Bess at 17.2 miles.
Nameplate capacity is the maximum output a plant can produce under ideal conditions — actual generation depends on fuel availability, demand, and maintenance schedules. Capacity factor (shown on individual plant pages) measures how much of that theoretical maximum a plant actually delivers over a year. Nuclear plants typically run above 90%; solar and wind range from 20–45% depending on location and weather.
All data comes from federal EIA and EPA releases. For a printable version of this proximity search, use the report link below. To explore all plants in Texas, visit the Texas state page.
← Search a different location · Printable proximity report →