Power Plants Near 78886 — Yancey, TX
37 power plants within 50 miles of ZIP 78886 (Yancey, Texas). Click any plant for capacity, generation, emissions, and generator-level detail.
Centroid: 29.1404, -99.1428 · County: Medina
| Distance | Plant | Fuel | Capacity | Operator |
|---|---|---|---|---|
| 12.4 mi | Dunlay Solar Hondo, TX | Solar | — | Ric Development, Llc |
| 14.1 mi | Morrow Lake Solar Pearsall, TX | Solar | 200 MW | Leeward Asset Management, Llc |
| 14.2 mi | Horizon Solar Pearsall, TX | Solar | 200 MW | Leeward Asset Management, Llc |
| 14.6 mi | Morrow Lake Bess Pearsall, TX | Battery Storage | — | Leeward Asset Management, Llc |
| 15.0 mi | Pearsall Pearsall, TX | Natural Gas | 202 MW | South Texas Electric Coop, Inc |
| 17.9 mi | Elara Solar Pearsall, TX | Solar | 132 MW | Lightsource Renewable Energy Asset Management, Llc |
| 29.1 mi | Sune Cps3 Llc Somerset, TX | Solar | 11 MW | Sune Cps3 Llc |
| 30.2 mi | Ap Sunray Llc Knippa, TX | Solar | 204 MW | Ap Sunray Llc |
| 31.9 mi | Nelson Gardens Landfill Gas To Energy San Antonio, TX | Biomass | 4 MW | Nelson Gardens Energy, Llc |
| 32.8 mi | Covel Gardens Gas Recovery San Antonio, TX | Biomass | 10 MW | Energy Developments, Inc D/B/A Edl |
| 32.9 mi | Poteet Poteet, TX | Battery Storage | — | Hen Infrastructure, L.l.c. |
| 33.3 mi | Heb_cps00085 San Antonio, TX | Natural Gas | 2 MW | Texas Microgrid, Llc |
| 34.1 mi | Uvalde 2 Bess 1 Uvalde, TX | Battery Storage | — | Consolidated Edison Development Inc. |
| 34.1 mi | Uvalde Solar 2 Uvalde, TX | Solar | — | Consolidated Edison Development Inc. |
| 34.1 mi | Uvalde Solar 1 Uvalde, TX | Solar | — | Consolidated Edison Development Inc. |
| 34.1 mi | Uvalde 2 Bess 2 Uvalde, TX | Battery Storage | — | Consolidated Edison Development Inc. |
| 34.1 mi | Alamo 5 Bess 1 Uvalde, TX | Battery Storage | — | Consolidated Edison Development Inc. |
| 35.0 mi | Oci Alamo 5 Llc Uvalde, TX | Solar | 100 MW | Consolidated Edison Development Inc. |
| 36.8 mi | Alamo 5 Bess 2 Uvalde, TX | Battery Storage | — | Consolidated Edison Development Inc. |
| 37.0 mi | Ferdinand Energy Center San Antonio, TX | Battery Storage | — | Ferdinand Grid, Llc |
| 37.2 mi | Leon Creek San Antonio, TX | Natural Gas | 230 MW | City Of San Antonio - (Tx) |
| 37.3 mi | Bramble Energy Center Batesville, TX | Battery Storage | — | Mission Clean Energy Devco Llc |
| 37.6 mi | Commerce Ess San Antonio, TX | Other Fossil | 10 MW | City Of San Antonio - (Tx) |
| 37.6 mi | Commerce Solar San Antonio, TX | Solar | 5 MW | City Of San Antonio - (Tx) |
| 39.5 mi | Alamo 3 Bess 2 Converse, TX | Battery Storage | — | Consolidated Edison Development Inc. |
| 41.1 mi | Ranchtown San Antonio, TX | Other Fossil | 10 MW | Engie North America |
| 42.0 mi | Tres Margaritas Solar Big Wells, TX | Solar | — | Gransolar Texas Six Llc |
| 42.4 mi | Bexar Ess San Antonio, TX | Battery Storage | — | Bexar Ess, Llc |
| 42.6 mi | Rio Lago Solar Bandera, TX | Solar | — | Rio Lago Solar, Llc |
| 43.1 mi | Oci Alamo Solar I Hybrid San Antonio, TX | Solar | 41 MW | Oci Energy Llc |
| 43.2 mi | Mission Road San Antonio, TX | Natural Gas | — | City Of San Antonio - (Tx) |
| 44.1 mi | Sunshiner Ess Tbd, TX | Battery Storage | — | Sunshiner Ess Llc |
| 44.3 mi | Sune Cps2 Llc San Antonio, TX | Solar | 10 MW | Sune Cps2 Llc |
| 44.3 mi | Sune Cps1 Llc San Antonio, TX | Solar | 10 MW | Sune Cps1 Llc |
| 46.2 mi | Blue Wing Solar Energy Generation San Antonio, TX | Solar | 14 MW | Duke Energy Renewables Services |
| 46.5 mi | Arthur Von Rosenberg Elmendorf, TX | Natural Gas | 575 MW | City Of San Antonio - (Tx) |
| 46.6 mi | V H Braunig Elmendorf, TX | Natural Gas | 1,713 MW | City Of San Antonio - (Tx) |
Power generation near this area
There are 37 power plants within 50 miles of Yancey, Texas (ZIP 78886), with a combined 3,681 MW of nameplate capacity. Solar is the most common fuel type in this area with 16 of the 37 nearby plants. The closest plant is Dunlay Solar at 12.4 miles.
Nameplate capacity is the maximum output a plant can produce under ideal conditions — actual generation depends on fuel availability, demand, and maintenance schedules. Capacity factor (shown on individual plant pages) measures how much of that theoretical maximum a plant actually delivers over a year. Nuclear plants typically run above 90%; solar and wind range from 20–45% depending on location and weather.
All data comes from federal EIA and EPA releases. For a printable version of this proximity search, use the report link below. To explore all plants in Texas, visit the Texas state page.
← Search a different location · Printable proximity report →