Power Plants Near 79342 — Loop, TX

20 power plants within 50 miles of ZIP 79342 (Loop, Texas). Click any plant for capacity, generation, emissions, and generator-level detail.

Centroid: 32.9162, -102.4221 · County: Gaines

Wind 35%Solar 29%Natural Gas 28%Battery Storage 7%
DistancePlantFuelNameplate capacityOperator
18.2 mi1000 Mile Solar
Plains, TX
Solar300 MW1000 Mile Solar, LLC
18.9 miMustang Station
Denver City, TX
Natural Gas521 MWGolden Spread Electric Cooperative, Inc
19.1 miMustang Station Unit 4
Denver City, TX
Natural Gas472 MWGolden Spread Electric Cooperative, Inc
20.5 miWasson CO2 Removal Plant
Denver City, TX
Natural Gas23 MWOccidental Permian Ltd
31.3 miAl Pastor Battery Storage Plant
Lamesa, TX
Battery Storage100 MWAl Pastor BESS LLC
31.9 miLamesa Solar
Lamesa, TX
Solar102 MWSouthern Power Co
34.2 miLamesa II
Lamesa, TX
Solar50 MWLamesa Solar II, L.L.C.
34.7 miLapetus
Andrews, TX
Solar100 MWDeriva Energy
39.8 miTumbleweed
Andrews, TX
Oil9 MWPower Depot Group A, LLC
42.3 miMesquite Creek Wind
Lamesa, TX
Wind211 MWDeriva Energy
42.5 miFrankel
Andrews, TX
Oil9 MWPower Depot Group A, LLC
43.3 miCirrus Wind 1 LLC
Tahoka, TX
Wind61 MWCirrus Wind 1 LLC
43.4 miBakke
Andrews, TX
Oil9 MWPower Depot Group A, LLC
44.9 miStephens Ranch Wind Energy LLC
O'Donnell, TX
Wind376 MWStephens Ranch Wind Energy LLC
46.0 miTahoka Wind
Tahoka, TX
Wind300 MWTahoka Wind, LLC
47.4 miBorden County BESS
Gail, TX
Battery Storage150 MWBorden County Battery Energy Storage System LLC
47.8 miJumbo Hill Wind Project
Andrews, TX
Wind161 MWEngie North America
48.0 miENGIE Long Draw Solar LLC
Gail, TX
Solar225 MWEngie North America
48.9 miBull Creek Wind
O'Donnell, TX
Wind180 MWBull Creek Wind LLC
49.8 miProspero Solar
Andrews, TX
Solar300 MWProspero Energy Project, LLC (Longroad)

Power generation near this area

There are 20 power plants within 50 miles of Loop, Texas (ZIP 79342), with a combined 3,660 MW of nameplate capacity. Solar is the most common fuel type in this area with 6 of the 20 nearby plants. The closest plant is 1000 Mile Solar at 18.2 miles.

Nameplate capacity is the maximum output a plant can produce under ideal conditions — actual generation depends on fuel availability, demand, and maintenance schedules. Capacity factor (shown on individual plant pages) measures how much of that theoretical maximum a plant actually delivers over a year. Nuclear plants typically run above 90%; solar and wind range from 20–45% depending on location and weather.

All data comes from federal EIA and EPA releases. For a printable version of this proximity search, use the report link below. To explore all plants in Texas, visit the Texas state page.

← Search a different location · Printable proximity report →