Power Plants Near 81334 — Towaoc, CO
19 power plants within 50 miles of ZIP 81334 (Towaoc, Colorado). Click any plant for capacity, generation, emissions, and generator-level detail.
Centroid: 37.2084, -108.7200 · County: Montezuma
| Distance | Plant | Fuel | Capacity | Operator |
|---|---|---|---|---|
| 10.2 mi | Cortez Solar 3, Llc Cortez, CO | Solar | 2 MW | Greenbacker Renewable Energy Corporation |
| 13.1 mi | Cortez Solar 2, Llc Cortez, CO | Solar | 5 MW | Greenbacker Renewable Energy Corporation |
| 15.1 mi | Cortez Solar 1, Llc Cortez, CO | Solar | 2 MW | Greenbacker Renewable Energy Corporation |
| 15.4 mi | Coyote Gulch Solar Lewis, CO | Solar | — | Canyonland Solar Llc |
| 15.4 mi | Canyonland Solar Cortez, CO | Solar | — | Canyonland Solar Llc |
| 17.2 mi | Towaoc Cortez, CO | Hydroelectric | 11 MW | U S Bureau Of Reclamation |
| 18.9 mi | Sun Bear Towaoec, CO | Battery Storage | — | Ms1 |
| 26.6 mi | Mcphee Cortez, CO | Hydroelectric | 1 MW | U S Bureau Of Reclamation |
| 32.1 mi | Pinon Energy Center Waterflow, NM | Natural Gas | — | Public Service Co Of Nm |
| 32.2 mi | San Juan Waterflow, NM | Coal | — | Public Service Co Of Nm |
| 32.4 mi | San Juan Solar I Kirtland, NM | Solar | 300 MW | San Juan Solar I, Llc |
| 34.4 mi | Dolores Canyon Solar Cahone, CO | Solar | — | Tri-State G & T Assn, Inc |
| 35.4 mi | Rockmont Solar And Storage Project Kirtland, NM | Solar | — | 201lc 8me Llc |
| 38.2 mi | Four Corners Fruitland, NM | Coal | 1,636 MW | Arizona Public Service Co |
| 38.6 mi | Red Mesa Solar Project Red Mesa, UT | Solar | 72 MW | Ntua Generation - Utah, Llc |
| 39.2 mi | Ntec Gas Plant Waterflow, NM | Natural Gas | — | Navajo Transitional Energy Company |
| 43.9 mi | Bluffview Farmington, NM | Natural Gas | 67 MW | City Of Farmington - (Nm) |
| 44.3 mi | Animas Farmington, NM | Natural Gas | — | City Of Farmington - (Nm) |
| 47.7 mi | Lpea Sunnyside Solar 1 Facility Durango, CO | Solar | 2 MW | La Plata Electric Assn, Inc |
← Search a different location · Printable proximity report →