Power Plants Near 97112 — Cloverdale, OR
41 power plants within 50 miles of ZIP 97112 (Cloverdale, Oregon). Click any plant for capacity, generation, emissions, and generator-level detail.
Centroid: 45.2858, -123.8356 · County: Tillamook
| Distance | Plant | Fuel | Capacity | Operator |
|---|---|---|---|---|
| 9.0 mi | Potb Digester Tillamook, OR | Biomass | 1 MW | Tillamook Biogas, Llc Digester |
| 19.4 mi | Grand Ronde Solar Grand Ronde, OR | Solar | 2 MW | Norwest Energy 14, Llc |
| 20.0 mi | Sulussolar28 Willamina, OR | Solar | 3 MW | Adapture Renewables, Inc. |
| 20.7 mi | Waterford Solar, Llc Csg Willamina, OR | Solar | — | Waterford Solar Llc |
| 22.7 mi | Cosper Creek Solar (Csg) Willamina, OR | Solar | 3 MW | Cosper Creek Solar, Llc |
| 23.3 mi | Steel Bridge Solar, Llc Sheridan, OR | Solar | 2 MW | Steel Bridge Solar. Llc |
| 24.3 mi | Butler Solar, Llc Sheridan, OR | Solar | 4 MW | Solriver Capital Llc |
| 24.3 mi | Sheridan Solar Llc (Csg) Sheridan, OR | Solar | 3 MW | Solriver Capital Llc |
| 24.6 mi | Red Prairie Solar Sheridan, OR | Solar | 2 MW | Tls Capital, Inc |
| 25.5 mi | Sulussolar33 Sheridan, OR | Solar | 3 MW | Adapture Renewables, Inc. |
| 25.9 mi | Ballston Solar Llc Sheridan, OR | Solar | 2 MW | Ballston Solar Llc |
| 29.6 mi | Riverbend Landfill Mcminnville, OR | Biomass | 5 MW | Wm Renewable Energy Llc |
| 29.7 mi | Yamhill Solar Llc Amity, OR | Solar | 1 MW | Standard Solar |
| 31.6 mi | Bellevue Solar Project Amnity, OR | Solar | 2 MW | Edf Renewable Asset Holdings, Inc. |
| 32.1 mi | Sesqui-C Solar (Csg) Yamhill, OR | Solar | 3 MW | Sesqui-C Solar, Llc |
| 34.7 mi | Orchard Knob Dallas, OR | Solar | 2 MW | Orchard Knob Solar Llc |
| 35.0 mi | Mill Creek Solar (Or) Sheridan, OR | Solar | 2 MW | Sp Solar 5, Llc |
| 35.0 mi | Dayton Cutoff Solar Mcminnville, OR | Solar | 2 MW | Sp Solar 7, Llc |
| 36.4 mi | Palmer Creek Solar, Llc Dayton, OR | Solar | 2 MW | Greenbacker Renewable Energy Corporation |
| 36.6 mi | O'neill Creek Solar Gaston, OR | Solar | 2 MW | O'neill Creek Solar Llc |
| 40.0 mi | Or - Green Key - Gun Club Dundee, OR | Solar | 3 MW | Gun Club Solar, Llc |
| 40.1 mi | Valley Creek Solar Salem, OR | Solar | 2 MW | Sp Solar 8, Llc |
| 40.2 mi | Wallace Solar Llc (Csg) Salem, OR | Solar | 3 MW | Solriver Capital Llc |
| 40.3 mi | Zena Solar Northwest Salem, OR | Solar | 3 MW | Zena Solar Llc |
| 42.7 mi | Wlwpcf Cogeneration Facility Keizer, OR | Biomass | 1 MW | City Of Salem Public Works |
| 42.9 mi | Milfordsolar Or Forest Grove, OR | Solar | 3 MW | Adapture Renewables, Inc. |
| 45.3 mi | St Louis Solar Gervais, OR | Solar | 2 MW | Neighborhood Power Corp. |
| 45.6 mi | Covanta Marion Inc Brooks, OR | Biomass | 13 MW | Covanta Marion Inc |
| 45.6 mi | Case Creek Solar Woodburn, OR | Solar | 2 MW | Case Creek Solar Llc |
| 46.4 mi | Ssd Marion 1, Llc Grevais, OR | Solar | 2 MW | Thor Solar 1 Cei, Llc |
| 46.5 mi | Carnes Creek Solar (Csg) Salem, OR | Solar | 3 MW | Carnes Creek Solar, Llc |
| 46.8 mi | Georgia-Pacific Toledo Mill Toledo, OR | Biomass | 19 MW | Georgia-Pacific Toledo Llc |
| 46.9 mi | Interstate Solar Gervais, OR | Solar | 2 MW | Sp Solar 1, Llc |
| 47.1 mi | Salem Smart Power Center Salem, OR | Other Fossil | 5 MW | Portland General Electric Co |
| 47.2 mi | Constable Bess Hillsboro, OR | Battery Storage | 75 MW | Portland General Electric Co |
| 47.5 mi | Kale Patch Solar Gervais, OR | Solar | 2 MW | Kale Patch Solar Llc |
| 48.1 mi | Labish Solar Llc Salem, OR | Solar | 2 MW | Labish Solar Llc |
| 48.3 mi | Bighorn Solar Salem, OR | Solar | 2 MW | Bighorn Solar, Llc |
| 48.4 mi | Ssd Marion 3, Llc Salem, OR | Solar | 2 MW | Thor Solar 1 Cei, Llc |
| 49.4 mi | Sulussolar25 Aurora, OR | Solar | 2 MW | Adapture Renewables, Inc. |
| 50.0 mi | Rafael Solar Salem, OR | Solar | 2 MW | Rafael Solar Llc |
Power generation near this area
There are 41 power plants within 50 miles of Cloverdale, Oregon (ZIP 97112), with a combined 197 MW of nameplate capacity. Solar is the most common fuel type in this area with 34 of the 41 nearby plants. The closest plant is Potb Digester at 9.0 miles.
Nameplate capacity is the maximum output a plant can produce under ideal conditions — actual generation depends on fuel availability, demand, and maintenance schedules. Capacity factor (shown on individual plant pages) measures how much of that theoretical maximum a plant actually delivers over a year. Nuclear plants typically run above 90%; solar and wind range from 20–45% depending on location and weather.
All data comes from federal EIA and EPA releases. For a printable version of this proximity search, use the report link below. To explore all plants in Oregon, visit the Oregon state page.