| Distance | Plant | Fuel | Nameplate capacity | Operator |
|---|---|---|---|---|
| 21.9 mi | POTB Digester Tillamook, OR | Biomass | 1 MW | Tillamook BioGas, LLC Digester |
| 39.4 mi | Georgia-Pacific Wauna Mill Clatskanie, OR | Biomass | 30 MW | Georgia-Pacific Wauna LLC |
| 42.5 mi | O'Neill Creek Solar Gaston, OR | Solar | 2 MW | O'Neill Creek Solar LLC |
| 44.0 mi | MilfordSolar OR Forest Grove, OR | Solar | 3 MW | Adapture Renewables, Inc. |
| 45.7 mi | Sesqui-C Solar (CSG) Yamhill, OR | Solar | 3 MW | Sesqui-C Solar, LLC |
| 47.2 mi | SulusSolar28 Willamina, OR | Solar | 3 MW | Adapture Renewables, Inc. |
| 48.2 mi | Beaver Clatskanie, OR | Natural Gas | 611 MW | Portland General Electric Co |
| 48.5 mi | Grand Ronde Solar Grand Ronde, OR | Solar | 2 MW | SunStrong Management |
| 48.5 mi | Port Westward Clatskanie, OR | Natural Gas | 483 MW | Portland General Electric Co |
| 48.5 mi | Port Westward Unit 2 Clatskanie, OR | Natural Gas | 226 MW | Portland General Electric Co |
| 49.0 mi | Waterford Solar, LLC CSG Willamina, OR | Solar | 3 MW | Waterford Solar LLC |
| 49.1 mi | Constable BESS Hillsboro, OR | Battery Storage | 75 MW | Portland General Electric Co |
| 49.6 mi | Butler Solar, LLC Sheridan, OR | Solar | 4 MW | SolRiver Capital LLC |
| 49.7 mi | Sheridan Solar LLC (CSG) Sheridan, OR | Solar | 3 MW | SolRiver Capital LLC |
Power generation near this area
There are 14 power plants within 50 miles of Manzanita, Oregon (ZIP 97130), with a combined 1,448 MW of nameplate capacity. Solar is the most common fuel type in this area with 8 of the 14 nearby plants. The closest plant is POTB Digester at 21.9 miles.
Nameplate capacity is the maximum output a plant can produce under ideal conditions — actual generation depends on fuel availability, demand, and maintenance schedules. Capacity factor (shown on individual plant pages) measures how much of that theoretical maximum a plant actually delivers over a year. Nuclear plants typically run above 90%; solar and wind range from 20–45% depending on location and weather.
All data comes from federal EIA and EPA releases. For a printable version of this proximity search, use the report link below. To explore all plants in Oregon, visit the Oregon state page.
← Search a different location · Printable proximity report →