Davidson County, North Carolina has 9 power plants totaling 54 MW of nameplate capacity. Browse every plant below with fuel type, operator, and capacity.
| Plant | City | Fuel | Nameplate capacity | Operator |
|---|---|---|---|---|
| High Rock Hydro | Denton | Hydroelectric | 33.0 MW | Eagle Creek Renewable Energy, LLC |
| Davidson III | Lexington | Solar | 4.5 MW | SunE B9 Holdings, LLC |
| Lexington | Lexington | Oil | 3.6 MW | North Carolina Mun Power Agny #1 |
| Works 53 | Lexington | Oil | 3.0 MW | Electric Glass Fiber America, LLC |
| Davidson IV | Lexington | Solar | 3.0 MW | SunE B9 Holdings, LLC |
| Lexington Health Center | Lexington | Oil | 1.8 MW | North Carolina Mun Power Agny #1 |
| Westside WWTP | Thomasville | Oil | 1.8 MW | City Of High Point - (NC) |
| Davidson Gas Producers LLC | Lexington | Biomass | 1.6 MW | Davidson Gas Producers LLC |
| Davidson V | Lexington | Solar | 1.5 MW | SunE B9 Holdings, LLC |
Davidson County, North Carolina has 9 power plants totaling 54 MW of nameplate capacity. Hydroelectric is the dominant fuel source at 61% of installed capacity, followed by Oil (19%) and Solar (17%). The largest facility is High Rock Hydro at 33 MW. Data comes from EIA Form 860, EIA Form 923, and EPA eGRID federal releases.
To find plants closer to a specific address in Davidson County, use the address lookup — it shows every plant within a chosen radius along with distance, fuel type, and emissions.