Steele County, North Dakota has 2 power plants totaling 170 MW of nameplate capacity. Browse every plant below with fuel type, operator, and capacity.
| Plant | City | Fuel | Capacity | Operator |
|---|---|---|---|---|
| Ashtabula Wind Ii Llc | Luverne | Wind | 120 MW | Ashtabula Wind Ii Llc |
| Luverne Wind Energy Center | Luverne | Wind | 49.5 MW | Otter Tail Power Co |
Steele County, North Dakota has 2 power plants totaling 170 MW of nameplate capacity. Wind is the dominant fuel source at 100% of installed capacity. The largest facility is Ashtabula Wind Ii Llc at 120 MW. Data comes from EIA Form 860, EIA Form 923, and EPA eGRID federal releases.
To find plants closer to a specific address in Steele County, use the address lookup — it shows every plant within a chosen radius along with distance, fuel type, and emissions.