Brown County, Ohio has 2 power plants totaling 205 MW of nameplate capacity. Browse every plant below with fuel type, operator, and capacity.
| Plant | City | Fuel | Nameplate capacity | Operator |
|---|---|---|---|---|
| Hillcrest Solar | Mt. Orab | Solar | 200 MW | Hillcrest Solar I, LLC |
| Brown County LFGTE Power Station | Georgetown | Biomass | 4.8 MW | Energy Developments, Inc d/b/a EDL |
Brown County, Ohio has 2 power plants totaling 205 MW of nameplate capacity. Solar is the dominant fuel source at 98% of installed capacity, followed by Biomass (2%). The largest facility is Hillcrest Solar at 200 MW. Data comes from EIA Form 860, EIA Form 923, and EPA eGRID federal releases.
To find plants closer to a specific address in Brown County, use the address lookup — it shows every plant within a chosen radius along with distance, fuel type, and emissions.