Electric generating plantEIA plant no. 65114

196 Tremont St(CSG)

Type
Solar Photovoltaic
Nameplate capacity
3.0 MW
Units
2
In service since
2021
Operator
196TRE WHAM8 Solar, LLC
Location
Carver, Plymouth County, Massachusetts
Rated 306th largest in Massachusetts · 9893rd of 14,761 in the U.S. · by nameplate

196 Tremont St(CSG) is a solar power plant in Massachusetts with a nameplate capacity of 3.0 MW. It generates roughly 3.7k MWh per year — enough to power about 356 average U.S. homes.

Its capacity factor of 14% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, 196 Tremont St(CSG) could make 26.3k MWh. In 2023 it made 3.7k MWh — the same as running at full power 14 hours in every 100.

Nameplate, full year26.3k MWh3.0 MW × 8,760 hours
Actually generated3.7k MWhEPA eGRID, 2023 · ≈356 homes

Peaking or variableCapacity factor 14%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A battery storage site

charge middaydischarge evening1battery containers2inverters, both ways3the grid
  1. Rows of shipping-container-sized battery racks store electricity chemically.
  2. Inverters charge them from the grid — often midday, when solar is plentiful and cheap.
  3. In the evening peak the same inverters run the other way and send power back.

Why the numbers look like this: every charge-and-discharge cycle loses some energy as heat, so a storage site usually reports slightly negative net generation: it takes in a little more than it gives back. Its job is timing, not making energy.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

SolarBiomassBattery Storage

Location

Address196 Tremont St
CityCarver
CountyPlymouth County
StateMassachusetts
ZIP02330
Coordinates41.84293, -70.73070
Operator196TRE WHAM8 Solar, LLC

Generators (2)

IDTechnologyFuelNameplate capacityStatusOnline
196BABatteriesBattery1.5 MWOperating2021
196PVSolar PhotovoltaicSolar1.5 MWOperating2021

Grid context

NERC RegionNPCC
Balancing AuthorityISO New England Inc.