Electric generating plantEIA plant no. 65057

299 Farm to Market Rd Hybrid(CSG)

Type
Solar Photovoltaic
Nameplate capacity
5.3 MW
Units
2
In service since
2021
Operator
299F2M WHAM8 Solar, LLC
Location
Wareham, Plymouth County, Massachusetts
Rated 132nd largest in Massachusetts · 7394th of 14,761 in the U.S. · by nameplate

299 Farm to Market Rd Hybrid(CSG) is a solar power plant in Massachusetts with a nameplate capacity of 5.3 MW. It generates roughly 7.9k MWh per year — enough to power about 750 average U.S. homes.

Its capacity factor of 17% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, 299 Farm to Market Rd Hybrid(CSG) could make 46.4k MWh. In 2023 it made 7.9k MWh — the same as running at full power 17 hours in every 100.

Nameplate, full year46.4k MWh5.3 MW × 8,760 hours
Actually generated7.9k MWhEPA eGRID, 2023 · ≈750 homes

Peaking or variableCapacity factor 17%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

WindSolarBiomassBattery Storage

Location

Address299 Farm to Market Rd
CityWareham
CountyPlymouth County
StateMassachusetts
ZIP02330
Coordinates41.79509, -70.72704
Operator299F2M WHAM8 Solar, LLC

Generators (2)

IDTechnologyFuelNameplate capacityStatusOnline
299PVSolar PhotovoltaicSolar3.0 MWOperating2021
299BABatteriesBattery2.3 MWOperating2021

Grid context

NERC RegionNPCC
Balancing AuthorityISO New England Inc.

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Plymouth County

View all plants in Plymouth County →

Explore more