Plymouth, Massachusetts · Plant code 65054

71 Charlotte Furnace Rd Hybrid(CSG)

71 Charlotte Furnace Rd Hybrid(CSG) is a solar plant in Plymouth, Massachusetts. This page is assembled from imported EIA-860, EIA-923, and EPA eGRID records.

Primary fuel Solar

Route-friendly label and badge.

Total capacity 2 MW

Plant nameplate capacity.

Annual generation 2,497 MWh

Annual output from imported EIA and EPA records.

Capacity factor 39%

A simple way to compare utilization.

Operations

Operations details

Sector IPP Non-CHP

Utility, IPP, industrial, or commercial style ownership.

Status Operating

Current operating status in the imported records.

Online year 2,021

Useful for technology-vintage context.

Location Wareham, Massachusetts

County and state routing anchor.

Emissions

Emissions details

CO2 0 tons

Annual plant-level total.

SO2 0 tons

Annual sulfur dioxide.

NOx 0 tons

Annual nitrogen oxides.

CO2 rate 0 lbs/MWh

Emission intensity, when available.

Fuel mix

Generation by fuel at the site.

Solar 2,529 MWh · 101% of generation
Mwh 0 MWh · 0% of generation
Other -32 MWh · -1% of generation

Ownership

Who owns the plant.

Owner 71CFR WHAM8 Solar, LLC

100%

Generators

Generator-level detail

Generator Technology Fuel Capacity Status Online
71CBA Batteries MWH 1 MW Operating 2,021
71CPV Solar Photovoltaic Solar 1 MW Operating 2,021

Generation trend

Monthly output pattern

103 MWh
Jan
130 MWh
Feb
206 MWh
Mar
204 MWh
Apr
248 MWh
May
242 MWh
Jun
244 MWh
Jul
249 MWh
Aug
248 MWh
Sep
273 MWh
Oct
204 MWh
Nov
146 MWh
Dec

Nearby plants

Closest comparison sites

Plymouth, Massachusetts

Acushnet AD Makepeace

Solar

Acushnet AD Makepeace is a solar plant in Plymouth, Massachusetts. This page is assembled from imported EIA-860, EIA-923, and EPA eGRID records.

4 MW 5,961 MWh 0 tons CO2
GLC-(CA) Edwards AFB,LLC 0.2 mi away

Plymouth, Massachusetts

Cranberry Highway Solar LLC

Solar

Cranberry Highway Solar LLC is a solar plant in Plymouth, Massachusetts. This page is assembled from imported EIA-860, EIA-923, and EPA eGRID records.

4 MW 2,212 MWh 0 tons CO2
Cranberry Highway Solar, LLC 0.7 mi away

Plymouth, Massachusetts

299 Farm to Market Rd Hybrid(CSG)

Solar

299 Farm to Market Rd Hybrid(CSG) is a solar plant in Plymouth, Massachusetts. This page is assembled from imported EIA-860, EIA-923, and EPA eGRID records.

5 MW 5,637 MWh 0 tons CO2
299F2M WHAM8 Solar, LLC 0.8 mi away

Plymouth, Massachusetts

77 Farm to Market Rd Hybrid(CSG)

Solar

77 Farm to Market Rd Hybrid(CSG) is a solar plant in Plymouth, Massachusetts. This page is assembled from imported EIA-860, EIA-923, and EPA eGRID records.

7 MW 9,351 MWh 0 tons CO2
77F2M WHAM8 Solar, LLC 1.0 mi away

Related routes

Context around this plant