Ables Springs Solar & Storage is a solar power plant in Texas with a nameplate capacity of 100 MW.
The 100 MW is nameplate capacity: the most this plant's generators are rated to produce, not what it actually generates. EPA eGRID reports no positive net generation for it this year.
How it works
Why the numbers look like this: every charge-and-discharge cycle loses some energy as heat, so a storage site usually reports slightly negative net generation: it takes in a little more than it gives back. Its job is timing, not making energy.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | 20460 N State Highway 34 |
|---|---|
| City | Terrell |
| County | Kaufman County |
| State | Texas |
| ZIP | 75161 |
| Coordinates | 32.81957, -96.18484 |
| Operator | Ables Springs Solar, LLC |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| BESS | Batteries | Battery | 100 MW | Operating | 2025 |
| Owner | Location | Share |
|---|---|---|
| Ables Springs Storage, LLC | Andover, MA | 10000.0% |
Ownership reported to EIA Form 860. Percentages reflect reported generator-level ownership share, averaged when a plant has multiple generators.
| NERC Region | TRE |
|---|---|
| Balancing Authority | Electric Reliability Council of Texas, Inc. |
Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.