Electric generating plantEIA plant no. 59440

Adelanto Solar II, LLC

Type
Solar Photovoltaic
Nameplate capacity
7.0 MW
Units
1
In service since
2015
Operator
Adelanto Solar II, LLC
Location
Adelanto, San Bernardino County, California
Rated 928th largest in California · 6926th of 14,761 in the U.S. · by nameplate

Adelanto Solar II, LLC is a solar power plant in California with a nameplate capacity of 7.0 MW. It generates roughly 17.0k MWh per year — enough to power about 1,620 average U.S. homes.

Its capacity factor of 28% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Adelanto Solar II, LLC could make 61.3k MWh. In 2023 it made 17.0k MWh — the same as running at full power 28 hours in every 100.

Nameplate, full year61.3k MWh7.0 MW × 8,760 hours
Actually generated17.0k MWhEPA eGRID, 2023 · ≈1,620 homes

Peaking or variableCapacity factor 28%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasWindSolar

Location

Address13401 Rancho Road
CityAdelanto
CountySan Bernardino County
StateCalifornia
ZIP92301
Coordinates34.55722, -117.37750
OperatorAdelanto Solar II, LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
SASSolar PhotovoltaicSolar7.0 MWOperating2015

Grid context

NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in San Bernardino County

View all plants in San Bernardino County →

Explore more